Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Design Build Multiple Award Task Order Contract
New Construction
Post-Bid
$500,000 to $10,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Building Renovations for the Allegany County LaVale Building
Renovation
Construction
Less than $2,150,000 est. value
La Vale, MD 21502

Frostburg Municipal Center Project
Addition
Construction
$2,890,000 est. value
Frostburg, MD 21532

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

D/B Northeast MATOC
Post-Bid
$1,000,000 to $250,000,000 est. value

Job Order Contracts (Joc) Region C
New Construction, Renovation
Results
$10,000,000 est. value

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Post-Bid
Less than $150,000,000 est. value

Y--FY19 Job Order Contract (JOC) NAVFAC Washington
Results
$10,000 to $30,000,000 est. value
Washington, DC 20374

Reported 12/01/2020 02:09 PM
Project Title

Frostburg Tech Building

Physical Address View project details and contacts
City, State (County) Frostburg, MD 21532   (Allegany County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method
Project Status Construction Commenced fourth quarter 2020
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

11,817 SF.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Cold-Formed Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Sheathing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Water Repellents, Thermal Protection, Weather Barriers, Roof Panels, Metal Roof Panels, Sheet Metal Flashing and Trim, Roof Accessories, Snow Guards, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Flush Wood Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Aluminum-Framed Entrances and Storefronts, Entrances, Windows, Metal Windows, Aluminum Windows, Door Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Panel Signage, Engraved Panel Signage, Telephone Specialties, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers.
Division 12 - Furnishings, Countertops, Simulated Stone Countertops.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Vibration and Seismic Controls for Plumbing Piping and Equipment, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, Meters and Gages for HVAC Piping, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Air Duct Accessories, HVAC Fans, Centrifugal HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Furnaces, Refrigerant Compressors, Packaged Compressor and Condenser Units, Refrigerant Condensers, Central HVAC Equipment, Convection Heating and Cooling Units, Humidity Control Equipment.
Division 26 - Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Conduit for Electrical Systems, Boxes for Electrical Systems, Wiring Connections, Low-Voltage Electrical Service Entrance, Switchboards and Panelboards, Panelboards, Power Distribution Units, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Personal Protection Systems, Electronic Personal Safety Emergency Aid Devices.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Retaining Walls, Precast Concrete Retaining Walls, Irrigation, Planting.
Division 33 - Utilities.
Division 40 - Process Integration, Process Control Auxiliary Devices.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Condensers and Evaporators, Process Humidifiers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents