Similar Projects
Woodville Road Widening Phase 1 - Old Hearne to Texas Avenue - ST_ 15_ 001 - City of Bryan
Infrastructure
Conception
$5,440,000 CJ est. value
Bryan, TX 77803

Old Hearne Reconstruction (Wilkes to Woodville) Phase 3 and 5 - ST_ 11_ 002/ST_ 11_ 003 - City of Bryan
Infrastructure
Conception
$4,400,000 CJ est. value
Bryan, TX 77803

Villa Maria C Store
New Construction, Infrastructure - 3,971 SF
Design
$1,000,000 CJ est. value
Bryan, TX 77807

Hansen-Zak
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Bryan, TX 77801

BTU Administration Office
New Construction, Infrastructure - 37,000 SF
Post-Bid
$20,000,000 CJ est. value
Bryan, TX 77808

Texas A and M Business Education Complex
New Construction, Infrastructure
Post-Bid
$54,023,000 CJ est. value
College Station, TX 77845

Borlaug Center Renovation and Addition
Renovation, Addition - 85,000 SF
Results
College Station, TX

JP/Constable Precinct 1 Building Site Work
Infrastructure
Results
$605,021 est. value
TX

Dutch Bros Coffee - University Drive (TX0305) / College Station
New Construction, Infrastructure - 930 SF
Construction
$500,000 CJ est. value
College Station, TX 77840

Reece Homes
New Construction, Infrastructure - 8,359 SF
Construction
$1,600,000 CJ est. value
Bryan, TX 77802

Pine Ridge Apartments
New Construction, Infrastructure - 13,571 SF
Pending Verification
$1,500,000 CJ est. value
College Station, TX 77840

Crossway Auto Center
New Construction, Infrastructure - 2,903 SF
Pending Verification
$246,755 CJ est. value
Bryan, TX 77808

WS Phillips Pkwy - GP Rd to Barron Rd Cut Off - City of College Stations
Infrastructure
Conception
$7,800,000 CJ est. value
College Station, TX 77845

Caliber Office Ti / Guaranty Bank Building
Renovation
Design
$75,000 est. value
Bryan, TX 77802

StayApt Suites - Sitework
New Construction, Infrastructure
Post-Bid
Bryan, TX 77802

Last Updated 04/11/2023 05:28 PM
Project Title

Windmill Park Subdivision

Physical Address View project details and contacts
City, State (County) Bryan, TX 77803   (Brazos County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The revised master plan was submitted into the City of Bryan and is under review. A full scope and end use has not been determined. No building permits have been submitted. Information regarding the architect and general contractor has not been disclosed. A firm timeline for construction has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents