Similar Projects
Water, Sewer, and Drainage Improvements for Union Park Phase 6A
Post-Bid
Little Elm, TX

Paving, Signage, and Lighting Infrastructure for Union Park Phase 6A
Post-Bid
Little Elm, TX

Silverado West Phase 2 Paving Improvements
Results
Aubrey, TX

Old Justin Road Pavement Reconstruction
Results
Northlake, TX 76226

Phase 1 - Grading, Paving, and Utility Package for Stone Hill Ranch Estates
Post-Bid
TX

Bruton Orand Boulevard at FM 1171 - Right Turn Lane
Results
$252,742 est. value
Flower Mound, TX 75028

Lewisville Valley Ridge Trail
Post-Bid
$1,800,000 est. value
Lewisville, TX

Rehabilitate Existing Roadway and Add Shoulders
Results
Less than $7,848,270 est. value
TX

2021 Street Improvement
Post-Bid
Argyle, TX

16" Water Line Extension
Results
Argyle, TX

Utility Improvements for Prosper Elms Apartments Phase 1
Post-Bid
Aubrey, TX 76227

Pavement Repair and Drainage Improvements
Term Contract
Results
$25,000 to $90,000 est. value
Copper Canyon, TX

Tannery Lake Dam Reconstruction
Post-Bid
Denton, TX

Crack Sealing Services
Term Contract
Results
$2,900,000 est. value
Denton, TX

Mobberly 30" Water Transmission Main
Post-Bid
Aubrey, TX

Last Updated 07/28/2022 01:35 PM
Project Title

Walton Drive - TOD 20-01 - City of Corinth

Physical Address View project details and contacts
City, State (County) Corinth, TX 76208   (Denton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $5,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the reconstruction of a two lane asphalt facility to a collector. The collector will be constructed of concrete and have a curb and gutter underground drainage system and concrete sidewalks. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of July 28, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents