Similar Projects
Annual Aboveground Storage Tank (AST) Inspections
Term Contract
Design
Baltimore, Perry Point, MD 21201

Annual Aboveground Storage Tank (AST) Inspections
Term Contract
Design
Baltimore, Perry Point, MD 21201

Water Tank Mixing Unit Installations
Alteration
Bidding
$400,000 est. value
Salisbury, MD 21801

Yearly Underground and Above Ground Storage Tank Testing
Infrastructure
Bidding
Saint Leonard, MD

Design Build Water Tower Repairs
Post-Bid
Germantown, MD 20874

Operational Superintendent for the Water and Wastewater Treatment Plants
Renovation, Term Contract
Post-Bid
Beltsville, MD 20705

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Germantown Water Tower
Term Contract
Post-Bid
Germantown, MD 20874

Water Storage Tank Reconditioning
Results
Charlestown, MD 21914

Contractor Design-Build (DB) Services and Recertification of Water Tower
Term Contract
Post-Bid
Germantown, MD 20874

Mayo Triton Beach Upgrade
Results
$500,000 to $1,000,000 est. value
MD

Cistern Troubleshooting and Repairs - Evergreen Elementary School
Alteration
Post-Bid
California, MD 20619

Maryland State Police Barrack "S" Centerville, Replace Two (2) Underground Storage Tanks With Three (3) Aboveground Storage Tanks
Results
$500,000 to $1,000,000 est. value
Centreville, MD 21617

Tank Inspection
Term Contract
Post-Bid
Andrews Air Force Base, MD

Last Updated 06/16/2022 11:31 AM
Project Title

Guilford Elevated Water Tank

Physical Address View project details and contacts
City, State (County) Columbia, MD   (Howard County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a proposed 2,500,000-gallon composite elevated water storage tank (EWST). The project includes, but is not limited to, installation of a composite style EWST and interior mechanical piping, tank instrumentation, lighting and electrical system, approximately 450 linear feet of 16-inch Ductile Iron Pipe (DIP) with one (1) 16-inch isolation valve and one (1) fire hydrant and gate valve assembly, 16 feet wide paved access road, stormwater management and drainage piping, perimeter fencing, site clearing, erosion control and forest protection, miscellaneous appurtenances, and incidental items of work as shown on the contract

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents