Last Updated | 01/13/2023 06:03 PM |
Project Title | US Highway 12 Electric Vehicle (EV) Charging Facilities |
Physical Address | View project details and contacts |
City, State (County) | Richland, WA 99352 (Benton County) |
Category(s) | Commercial, Heavy and Highway |
Sub-Category(s) | Gas Station, Site Development, Vehicle Sales/Service |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $540,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For US Highway 12 Electric Vehicle Site Construction as fully described in Solicitation 705927. Questions due by December 28, 2022, by 11:00 am PST The project will consist of seven separate sites. The sites are listed below with the specific EVCSs for each. The EVCSs are currently being stored at the Lewis County Public Utility District office in Morton, WA or at Energy Northwest's facilities in Packwood, WA. Contractor shall coordinate transfer/possession of the EVCSs within 30 days of Contract Award. 1. Site #1 - Elbe, WA a. Mt. Rainier Railroad Dining Co., 54106 Mountain Hwy East, Elbe, WA, 98328 in an existing gravel parking lot. b. Contractor shall install the following equipment, which will be provided by Energy Northwest: 1. One ChargePoint 62.5 kW Express 250 Level 3 DC Fast Charger 2. One ChargePoint CT4000 7.2kW Level 2 charging station c. Contractor shall ensure the equipment is connected to Lewis PUD's distribution system with a 3-phase 240/480 VAC connection. 2. Site #2 - Salkum, WA a. Salkum Timberland Library, 2480 US-12, Salkum, WA 98582 in an existing parking lot. b. Contractor shall install the following equipment, which will be provided by Energy Northwest: 1. One ChargePoint 62.5 kW Express 250 Level 3 DC Fast Charger 2. One ChargePoint CT4000 7.2kW Level 2 charging station c. Contractor shall ensure the equipment is connected to Lewis PUD's distribution system with a 3-phase 240/480 VAC connection. 2. Site #3 - Mossyrock, WA a. Mossy-Mini, 748 Williams St., Mossyrock, WA 98564 in an existing parking lot. b. Contractor shall install the following equipment, which will be provided by Energy Northwest: 1. One ChargePoint 62.5 kW Express 250 Level 3 DC Fast Charger 2. One ChargePoint CT4000 7.2kW Level 2 charging station c. Contractor shall ensure the equipment is connected to Lewis PUD's distribution system with a 3-phase 240/480 VAC connection. 3. Site #4 - Morton, WA a. Arbor Health Morton Hospital located at 541 Adams Ave, Morton, WA 98937 in an existing parking lot. b. Contractor shall install the following equipment, which will be provided by Energy Northwest: 1. One ChargePoint 62.5 kW Express 250 Level 3 DC Fast Charger 2. One ChargePoint CT4000 7.2kW Level 2 charging station c. Contractor shall ensure the equipment is connected to Lewis PUD's distribution system with a 3-phase 240/480 VAC connection. 4. Site #5 - Randle, WA a. 9781 US-12, Randle, WA 98937 on an undeveloped piece of land. b. Contractor shall install the following equipment, which will be provided by Energy Northwest 1. One ChargePoint 62.5 kW Express 250 Level 3 DC Fast Charger 2. One ChargePoint CT4000 7.2kW Level 2 charging station c. Contractor shall ensure the equipment is connected to Lewis PUD's distribution system with a 3-phase 240/480 VAC connection. 5. Site #6 - Packwood, WA a. Tatoosh Market, 13053 US-12, Naches, WA 98361 in an existing parking lot. b. Contractor shall install the following equipment, which will be provided by Energy Northwest: 1. One ChargePoint 62.5 kW Express 250 Level 3 DC Fast Charger 2. One ChargePoint CT4000 7.2kW Level 2 charging station c. Contractor shall ensure the equipment is connected to Lewis PUD's distribution system with a 3-phase 240/480 VAC connection. 6. Site #7 - White Pass Ski Area a. White Pass Ski Area, 48850 US-12, Naches, WA 98937 in an existing gravel parking lot. b. Contractor shall install the following equipment, which will be provided by Energy Northwest: 1. One ChargePoint 62.5 kW Express 250 Level 3 DC Fast Charger 2. One ChargePoint CT4000 7.2kW Level 2 charging station c. Contractor shall ensure the equipment is connected to Benton REA's distribution system with a 3-phase 120/208 VAC connection. Loreen Olds, Procurement Specialist II Phone: (509) 372-5675 Email: lcolds@energy-northwest.com rgrebich@energy-northwest.com |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |