Similar Projects
Last Updated | 07/18/2023 10:07 AM |
Project Title | Southwest Water Treatment Plant Sedimentation Basin Improvements |
Physical Address | View project details and contacts |
City, State (County) | Madison, AL 35756 (Limestone County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,710,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project is generally described as follows: demolition of concrete masonry unit baffle walls in basins 1 and 2; replace baffle walls with 304 Stainless Steel baffle walls; demolition of existing sludge collection system for 4 basins; install new hose-less sludge collection system in each basin; demolition of existing lime silos and piping; construct new fluoride storage tank area with double wall tank; remove selected existing chemical storage tank; provide new chemical storage tanks as described in the specifications and contract drawings The right to reject any and all bids is reserved. A cashier's check or a bid bond payable to the City of Huntsville, Alabama, d/b/a/ Huntsville Utilities for an amount not less than 5% of the contractor's bid, but in no event more than $10,000.00, will be required to accompany each contractor's bid. Performance and Payment bonds are required for this project. All questions should be submitted via email to miranda.duke@hsvuti1.org by April 7, 2023, close of business. The Work consists of the following: 1. The project consists of improvements to the Huntsville Utilities Southwest Water Treatment Plant. This list is not all inclusive, but in general work will include the following: o Demolish cmu baffle walls in Basins 1 and 2 and replace with 304 SS o Demolish existing sludge collection system and install new hose-less sludge collector system in each basin. o Demo existing lime silos and piping. Construct new fluoride storage tank area with double walled tank. o Remove existing and provide new chemical storage tanks. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |