Similar Projects
Sawyer Hayes Conference Center Chiller Replacement
Renovation
Post-Bid
Less than $434,149 est. value
Louisville, KY 40241

Fire Department Vehicle Exhaust Extraction System
Post-Bid
Fort Mitchell, KY 41017

HVAC Preventative Maintenance, NWS Paducah, KY
Results
Paducah, KY

Walton Verona High School Rooftop Equipment
Results
Walton, KY 41094

Hazelwood HVAC System Replacement
Post-Bid
Less than $48,000 est. value
Louisville, KY

Jack C. Fisher Park Concession Building HVAC Upgrade
Results
Owensboro, KY 42301

HVAC Yearly Maintenance
Term Contract
Post-Bid
Elizabethtown, KY 42701

Cedar Creek WQTC - Effluent Parshall Flume Upgrade
Results
$1,000,000 to $2,000,000 est. value
Louisville, KY 40291

Vehicle Exhaust Removal System
Post-Bid
Elsmere, KY 41018

MFWQTC Chiller Replacement
Results
$200,000 to $800,000 est. value
Louisville, KY 40211

Court Complex Duct Cleaning 2021
Term Contract
Post-Bid
Nicholasville, KY 40356

Salato Education Center HVAC Replacement
Results
Less than $524,000 est. value
Frankfort, KY

HVAC and Mechanical Products
Term Contract
Post-Bid

MATES Building HVAC Repairs
Results
Less than $215,430 est. value
KY

Two Rooftop HVAC Units
Results
Independence, KY 41051

Last Updated 01/19/2022 04:41 PM
Project Title

HVAC Replacement

Physical Address View project details and contacts
City, State (County) Crestview Hills, KY 41017   (Kenton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000 to $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Work is generally described as follows: Furnishing the labor, materials, tools, equipment and services necessary for the replacement of the (4) packaged rooftop units with (4) new gas-fired packaged rooftop units. This work also includes: installing (7) new VVT boxes as replacements; (3) new VVT boxes as added zones; some new ductwork; install new controls for all systems and complete setup and calibration of controls per manufacturer`s instructions; install (4) new transfer ducts for the restroom makeup air; install new manual dampers on each duct branch to balance the system; balance the system including the rooftop units, VVT boxes, and each air device in the space; and installing bi-polar ionization for each packaged rooftop unit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents