Similar Projects
8th Street Improvements Motor City Way to Fountain Creek - City of Colorado Springs
Infrastructure
Conception
$1,625,119 CJ est. value
Colorado Springs, CO 80905

8th Street Improvements Motor City Way to Fountain Creek - City of Colorado Springs
Infrastructure
Conception
$1,625,119 CJ est. value
Colorado Springs, CO 80905

AutoZone #5811 / Colorado Springs
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Colorado Springs, CO 80908

AutoZone #5811 / Colorado Springs
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Colorado Springs, CO 80908

RFQ D/B - Consolidate Cadet Preparatory School Dormitory
Demolition, New Construction, Infrastructure
Bidding
$100,000,000 CJ est. value
US Air Force, CO 80840

RFQ D/B - Consolidate Cadet Preparatory School Dormitory
Demolition, New Construction, Infrastructure
Bidding
$100,000,000 CJ est. value
US Air Force, CO 80840

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Water System Improvements - 2021 Materials
Infrastructure
Results
Colorado Springs, CO

Construction of the Fountain Mesa Road - Caballero Avenue Intersection
Infrastructure
Results
$1,500,000 to $2,500,000 est. value
Colorado Springs, CO 80902

Hampton Inn
New Construction
Construction
$2,000,000 est. value
Colorado Springs, CO 80900

South Academy Highlands Western Out Lots - Site Work
Infrastructure
Construction
Fountain, CO 80817

Victory Ridge Park
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Colorado Springs, CO 80908

Victory Ridge Park
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Colorado Springs, CO 80908

Airport Taxiway A Re-Alignment - City of Colorado Springs
Infrastructure
Conception
$14,200,000 CJ est. value
Colorado Springs, CO 80916

Last Updated 06/19/2023 09:37 AM
Project Title

Concrete Work at Intersections, Involving Asset Protection/repair, Turn Lane Curb Work and Pedestrian Safety Improvements

Physical Address View project details and contacts
City, State (County) Peyton, CO 80831   (El Paso County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $244,433 [brand] Estimate
Plans Available from Civil Engineer - 11/03/22
Owner View project details and contacts
Architect View project details and contacts
Description

Region: 2 Counties:El Paso, Fremont, Huerfano, Pueblo Projects: STMR200-275 Contract ID: C24672R UDBE Goal: 0.00% This project consists of concrete work at intersections, involving asset protection/repair, turn lane curb work and pedestrian safety improvements. The work will include, but is not limited to, replacing existing ADA curb ramps, installing ADA curb ramps, crosswalk work, replacement of existing curb & gutter and sidewalk and drainage improvements as needed at seven locations in Colorado Springs, Pueblo, Manitou Springs, Walsenburg, and Canon City. It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 (X) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 CODOT - 012 - Concrete Work at Intersections, Involving Asset Protection/repair, Turn Lane Curb Work and Pedestrian Safety Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents