Similar Projects
High Service Pump Control Valve
Infrastructure
Bidding
Apex, NC 27523

Raw Water Wells
Post-Bid
Laurinburg, NC 28353

Contract III - 2020 USDA Well Building Improvements
Post-Bid
Red Springs, NC 28377

Y--Replace Potable Water Wells and Install Raw Water Main
Results
$1,000,000 to $5,000,000 est. value
Cherry Point, NC 28533

Design-Build Delivery of the Cape Hatteras RO Wellfield Expansion
Results
Frisco, NC 27936

Monitoring Well Abandonment
Post-Bid
NC

NRRRF RAS Screw Pump Replacement
Results
Less than $4,300,000 est. value
Raleigh, NC 27610

Raw Water Pump and Motor
Post-Bid
Camp Lejeune, NC

Water Treatment Plant Finished Water Pumping Improvements
Results
Carrboro, NC

Portable Hydraulic Power Unit and Hydraulic Power Head
Post-Bid
Camp Lejeune, NC 28547

I-40/NC-403 Well Head and Manganese Treatment System
Results
NC

Maintenance and Repair of Screw Pumps
Post-Bid
Camp Lejeune, NC 28547

Bladen County Water District - Phase IV, Contract 2 - Production Well Project
Results
NC

Stoney Point Elementary Loop Pump Replacement
Post-Bid
Fayetteville, NC 28302

C and D RAS Pump Rehabilitation
Results
Less than $6,000,000 est. value
Rocky Mount, NC 27801

Reported 06/24/2021 02:34 PM
Project Title

Well Pump Replacement And Installation

Physical Address View project details and contacts
City, State (County) Greensboro, NC   (Guilford County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

• Remove and properly dispose of existing 25 HSP Pump • Remove and properly dispose of 460’ of 3” Drop Piping • Install a new 25 HSP, 6” Meter • Install a new 150 GPM Fluid End • Install 460’ of new Galvanized 3” Drop Pipe • Install 460’ of new #8, 4” Wire Pump Cable • Install new 8” x 3” well seal, fittings, and check valves • Make all new connections, as may be required

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents