Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Construct Pollution Infiltration Areas and Austin Vault Sand Filter
Infrastructure
Bidding
$3,680,000 est. value
CA

Storm Water Drain Water Pump Services
Infrastructure
Bidding

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

San Andreas Road PM 1.24 and 1.30 Browns Valley Road PM 2.14 and Mt Madonna PM 0.96 Storm Damage Repair Project
Infrastructure
Results
San Andreas, CA

Sewer Main Spot Repair
Alteration
Results
$650,000 est. value
Whittier, CA 90603

Fort Baker Sewer and Manhole
Term Contract
Design
Mill Valley, CA 94941

Parkmeadow Drive Storm Drain Replacement
Infrastructure
Bidding
$805,000 est. value
Fremont, CA 94539

Operation and Maintenance Services of Sewer and Water Systems in County Service Area (Csa) R-1967-1 Castlewood
Alteration
Post-Bid
CA

Interstate 10 Sewer Crossing
Infrastructure
Results
Yucaipa, CA 92399

Llano Lane Storm Drain Improvement
Infrastructure
Bidding
$461,400 est. value
CA

Harbor Bay Isle Lagoon Improvements Project
Infrastructure
Post-Bid
$250,000 est. value
Alameda, CA 94502

Gold Flat Campground Upgrades
Renovation
Results
$700,000 to $1,100,000 est. value
Oroville, CA 95966

Reported 03/24/2022 12:00 AM
Project Title

Storm Drain Catch Basin Inserts

Physical Address View project details and contacts
City, State (County) Inglewood, CA 90301   (Los Angeles County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Per locations on the list, 1) Remove existing screen at catch basin inlet. 2) Clean existing catch basins. 3) Install new Automatic Retractable Screen (ARS) and Connector Pipe Screen (CPS) on catch basin.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents