Similar Projects
Kickback Jack's Restaurant
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Alcoa, TN 37701

Clayton Lodge Kitchen Expansion
Addition, Demolition, Infrastructure
Design
$500,000 CJ est. value
Maryville, TN 37804

Photovoltaic Array
Infrastructure
Design
$10,000,000 CJ est. value
Louisville, TN 37777

Big Springs Road Bridge Replacement
Infrastructure
Bidding
$400,000 CJ est. value
Maryville, TN 37801

RFP - 246 North Rankin Road Development
New Construction, Infrastructure
Bidding
$235,798 CJ est. value
Alcoa, TN 37701

Great Smoky Mountains - Road Repair and Site Work
Infrastructure
Post-Bid
$2,000,000 to $10,000,000 est. value
Tallassee, TN

Northfield Drive Stormwater Pipe Replacement Project
Infrastructure
Post-Bid
$295,000 CJ est. value
Maryville, TN 37804

New Career and Technical Education (CTE) Building at: Existing Eagleton College and Career Academy - Phase I
Renovation, Infrastructure
Results
$16,293,000 CJ est. value
Maryville, TN 37804

North End Booster Pump Stations
New Construction, Infrastructure
Results
$1,027,963 CJ est. value
Lenoir City, TN 37772

Frogpond Road Subdivision
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Friendsville, TN 37737

Stone Creek Office and Warehouse
New Construction, Infrastructure - 17,099 SF
Pending Verification
$2,000,000 CJ est. value
Maryville, TN 37803

Maryville Top Shop Addition
Addition, Demolition, Infrastructure - 4,052 SF
Design
$900,000 CJ est. value
Maryville, TN 37804

Eagleton Ballpark Redevelopment
Infrastructure
Bidding
$420,000 CJ est. value
Maryville, TN 37804

McGhee Tyson Airport (TYS) Terminal Apron Expansion
New Construction, Infrastructure
Post-Bid
$10,200,000 CJ est. value
Alcoa, TN 37701

2023 Road Improvement Projects
Infrastructure
Results
$472,720 CJ est. value
Louisville, TN 37777

Last Updated 09/18/2023 04:03 PM
Project Title

Ardmore at Topside Apartments Bldg 1700 Sewage Pump Station and Force Main

Physical Address View project details and contacts
City, State (County) Louisville, TN 37777   (Blount County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing and installing the following major work elements: Prefabricated duplex submersible sewage pump station (with 135-gpm per pump capacity), including a 12.5-footdeep, 6-foot-diameter prefabricated fiberglass wetwell/valve vault, cast-in-place concrete pads, control panel, control panel rain/sun hood, valves, temporary bypass pumping assembly, ductile iron piping and fittings, LP backup generator, miscellaneous electrical, chain-link fencing, graveled pump station site, etc.; approximately 15 linear feet of 6-inch-diameter gravity sewer line; and approximately 98 linear feet of 4-inch-diameter HDPE sewer force main and associated appurtenances adjacent to the southside of Building 1700 within the new Ardmore at Topside Apartments development located on the tract of land at 1000 Ardmore Alcoa Way, Louisville, Tennessee.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents