Similar Projects
Deep River Rock Riffle Improvements
Renovation
Results
Lake Station, IN 46405

Eagle Creek Dam Improvements Division A
Results
$1,100,000 to $1,500,000 est. value
Indianapolis, IN 46204

West Lafayette Campus Multiple Tunnels Infrastructure Repair 2020
Results
West Lafayette, IN 47907

BL000A Crescent Steam Tunnel Repairs
Results
Bloomington, IN

Dam Removal on Sugar Creek
Post-Bid
Crawfordsville, IN

Last Updated 12/17/2020 04:17 PM
Project Title

Indiana Harbor Confined Disposal Facility Dike Raise

Physical Address View project details and contacts
City, State (County) Whiting, IN 46394   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT INFORMATION: Under the contract, the contractor will be required to This project requires a typical 3-ft increase in crest elevation of the existing 8,833-ft long compacted clay dike (a dam) and widening a 2,000-ft long segment of the dike base by a typical amount of 40 ft. Optional work includes raising the crest an additional 8 ft in elevation and widening the base of the remaining dike segment. The project, including base and option, will place roughly 350,000 CY of compacted fill, two exterior access ramps, two interior access ramps, placement of riprap on the interior dike slope, a chimney drain and filter, a designated overtopping location, a new gravel access road, seeding the exterior of the dike, a collection trench and off-gassing vent, a weather monitoring station, modification of a pilesupported concrete decant structure, and replacement of force mains, valves, concrete vaults and manholes, lift station pumps, piezometers and air monitoring pads.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents