Similar Projects
CIPP Rehabilitation of Portions of the Monongahela Subaqueous Interceptors
Infrastructure
Bidding
Pittsburgh, PA 15233

Water and Sewer Inventory Supplies
Infrastructure
Bidding
Pittsburgh, PA 15222

2020 Small Diameter Water Main Replacement Contract A
Post-Bid
Pittsburgh, PA 15222

2020 Small Diameter Water Main Replacement Contract B
Post-Bid
PA

Backwater Valve Maintenance Contract
Results
Pittsburgh, PA

Silver Alley Waterline Project
Results
McKeesport, PA 15132

Clinton Area Waterline Replacement - Area 100
Infrastructure
Bidding
Less than $515,000 est. value
Clinton, PA

Furnishing and Delivering Ductile Iron Pipe and Accessories
Post-Bid
Pittsburgh, PA

2020 Lead Service Line Identification Program
Results
Pittsburgh, PA 15222

Clinton Area Waterline Replacement - Area 200
Infrastructure
Bidding
$660,000 est. value
Clinton, PA

Outer Transmission Waterline Loop Project-Phase III
Post-Bid
Brackenridge, PA 15014

2019 Small Diameter Water Main Replacement Contract
Results
Pittsburgh, PA

Private Water Main and Meter Vault Relocation - Allegheny Campus
Post-Bid
$150,000 to $200,000 est. value
Pittsburgh, PA 15233

WPJWA 3rd Avenue Waterline Replacement
Results
Monroeville, PA 15146

Fire Hydrants
Post-Bid
Sewickley, PA 15143

Last Updated 06/18/2021 07:41 AM
Project Title

2019 Large Diameter Water Main Improvements (Rising Main 3 and 4) Project

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA   (Allegheny County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CM/CI services for the 2019 Large Diameter Water Main Improvements Contract, which includes the rehabilitation and partial replacement of Highland Rising Main No. 3, and the rehabilitation of Highland Rising Main No. 4. The work includes but is not limited to: lining of nominal 50-inch diameter wrought iron pipe and 48-inch steel pipe with carbon fiber reinforced polymer (CFRP), lining of nominal 48-inch diameter riveted steel pipe and cast iron pipe with glass fiber reinforced polymer (GFRP), construction of new 48-inch pipe by open cut construction, modifications to an existing valve vault, and abandonment of nominal 48-inch diameter riveted steel pipe.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents