Similar Projects
Vent Hood Cleaning Services - Annual Contract
Term Contract
Bidding
Jonesboro, GA

High Density Polyethylene (Hdpe) Pipe And Fittings
Bidding
GA

Statewide Drainage Asset Management Program
Post-Bid

Annual Contract for General Pipe Work
Term Contract
Post-Bid
Morrow, GA 30260

Water, Waste Water, and Storm Water Run-Off Usage at The Gillem Enclave
Results
Forest Park, GA 30297

Rooftop Units for Fayetteville Elementary School
Results
Fayetteville, GA 30214

HVAC Services and Equipment Annual Contract
Term Contract
Post-Bid
Jonesboro, GA 30236

Annual Contract for Small Pressure - Flow Pipe Work
Term Contract
Results
Less than $161,403 est. value
Morrow, GA

Sewer System Evaluation Surveys
Post-Bid
Lake City, GA 30260

Water Meter Installations and Service Renewals
Term Contract
Results
Less than $2,285,925 est. value
Morrow, GA 30260

Fire Stations 5 and 10 HVAC Replacement
Post-Bid
Fayetteville, GA 30215

Annual Contract for Small Gravity-Flow Pipe Work
Term Contract
Results
Less than $191,857 est. value
Morrow, GA 30260

HVAC and Mechanical Products
Term Contract
Post-Bid

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Combined Sewer Replacement
Post-Bid
Atlanta, GA

Last Updated 04/28/2021 08:47 AM
Project Title

Design Build Services for Campus Infrastructure

Physical Address View project details and contacts
City, State (County) Morrow, GA 30260   (Clayton County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Fire Protection, HVAC, Storm/Sewers, Water Lines
Contracting Method Design-Build.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Due to budget constraints the entire replacement/upgrade will be completed in several phases based on a complete survey, potholing, and the establishment of a comprehensive plan. The scope of this project will include the replacement and upgrade of some of the most critical and failing components of the core underground infrastructure. Project scope includes but not limited to the replacement and upgrade of ~6,000 LF of original domestic and fire suppression water service mains and valves, ~1,600LF of looped HVAC chilled water piping and associated valves; and ~3,000 LF of original sanitary sewer lines, and gas lines.

Details

Division 03 - Concrete, Precast Concrete.
Division 21 - Fire Suppression.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents