Similar Projects
Tanners Bridge Water Treatment Facility Operations Building - Barrow County
Renovation
Conception
$325,000 CJ est. value
Monroe, GA 30656

Tanners Bridge Water Treatment Facility Effluent Filter - Barrow County
Renovation
Conception
$400,000 CJ est. value
Monroe, GA 30656

Onsite Generators
Alteration
Bidding
Augusta, GA

Waste Water Treatment Facility Miscellaneous Improvements
Renovation
Bidding
$200,000 est. value
Thomasville, GA

Outdoor Sports Field Lighting
Term Contract
Sub-Bidding
College Park, GA 30337

Chemicals for Water Treatment / Wastewater Treatment Plants
Term Contract
Sub-Bidding
Milledgeville, GA 31061

Express Circuit for Peach County High School
Post-Bid
Fort Valley, GA 31030

Generator Installation
Post-Bid
Leesburg, GA 31763

Professional Operations, Maintenance and Management Services
Results
GA

Replacement of an Existing Generator
Results
Hinesville, GA 31313

Spalding County Water & Sewerage Facilities Authority
Demolition, Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Griffin, GA 30223

Uninterruptible Power Supply (UPS) and Inverter Maintenance Services
Post-Bid
Kennesaw, GA

Electrical Contractor Services - Science Annex - Replace Building Switchgear System
Results
Less than $175,000 est. value
Atlanta, GA 30303

Generator System Maintenance and Repair Services
Alteration
Bidding
Atlanta, GA

Renovation of Three Hundred Thirty One (331) Electrical Panels
Post-Bid
Americus, GA 31719

Last Updated 08/04/2022 04:01 AM
Project Title

Generators for Various Joint Water and Sewer Commission (JWSC) Operations Locations

Physical Address View project details and contacts
City, State (County) Brunswick, GA 31520   (Glynn County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Brunswick-Glynn Joint Water & Sewer Commission (JWSC) seeks bids from qualified suppliers to provide a total of (13) diesel powered generators: (8) stationary diesel generators and (5) diesel-powered portable units. These generators will be installed by others to provide backup power to various JWSC Operations locations. Installation is not included in this request. Vendor is required to coordinate fabrication and shipping with the JWSC or its designee which may include a contractor if a contract has been executed between the JWSC and an electrical Contractor. Each site currently has an existing generator in place. Maintaining station operation during replacement by the JWSC and the electrical Contractor is critical. Therefore, a detailed sequence of work is required. The sequence of work will address the down time that can be accommodated or the need for the Contractor to provide temporary power (generator) to keep the station in operation. As the delivery of the equipment units is a critical element of this overall sequence of work, an estimated delivery date for each unit will need to be included in your bid submission on the bid form. Deadline for questions is Wednesday, July 20, 2022, no later than 5:00 p.m. EST. Questions must be directed in writing (via e-mail) to the Purchasing Director, Pamela Drury-Crosby, email- pcrosby@bgjwsc.org 01 Academy Creek WPCF-1 Generator Bldg 2909 Newcastle Street, Brunswick, GA 31520 750 kW/ 938 kVA 480Y/277V 3- Phase 4 Wire 02 Academy Creek WPCF-2 Generator Bldg 2909 Newcastle Street, Brunswick, GA 31520 350 kW/ 438 kVA 480Y/277V 3- Phase 4 Wire 03 FLETC Water Production Facility Federal Law Enforcement Training Center, (Intersection of Tucson Ave and Judicial Dr) Brunswick, GA 31520 200 kW/ 250 kVA 480Y/277V 3- Phase 4 Wire 04 Goodyear Water Production Facility 3226 Hampton Avenue, Brunswick, GA 31520 230 kW/ 288 kVA 480Y/277V 3- Phase 4 Wire 05 Howard Coffin Water Production Facility 1402 Howard Coffin Park, Brunswick, GA 31520 175 kW/ 219 kVA 480Y/277V 3- Phase 4 Wire 06 Mallory Water Production Facility 950 Mallery Street, St. Simons Island, GA 31522 215 kW/ 269 kVA 480Y/277V 3- Phase 4 Wire 07 Airport Water Production Facility 0 Demere Road, St. Simons Island, GA 31522 300 kW/ 375 kVA 240Y/120V 3- Phase 4 Wire 08 Academy Creek WPCF-3 Generator - OPS Bldg 2909 Newcastle Street, Brunswick, GA 31520 1250 kW/ 1562 kVA 480Y/277V 3-Phase 4 Wire 09 Portable Generators - Quantity of (5) - Stored at Academy Creek Site 2909 Newcastle Street, Brunswick, GA 31520 200 kW/ 250 kVA 480Y/277V 3- Phase 4 Wire

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents