Similar Projects
Main Street District (MSD) Water System Improvements
Infrastructure
Bidding
$459,000 est. value
Truth or Consequences, NM

2020 CDBG Water System Improvement
Infrastructure
Bidding
$800,000 est. value
Dexter, NM

El Creston MDWCA Water System Improvements Project
Post-Bid
Las Vegas, NM 87701

Water System Improvements
Post-Bid
$540,000 to $610,000 est. value
Tatum, NM

Valle Del Rio Water System Improvements
Results
La Mesa, NM

Jacquez Road Line Extension
Results
$99,856 est. value
La Mesa, NM 88021

West Side Water Main Replacement I.H.S
Infrastructure
Construction
San Felipe Pueblo, NM

Riverside Waterline and Spring Tank Replacement
Post-Bid
Ruidoso Downs, NM

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Lea County Airport Water and Sewer Extension
Post-Bid
Hobbs, NM 88240

Pena Blanca Water and Sanitation District Water System Improvements
Results
Pena Blanca, NM 87041

Engineering Services for Pinecliff Water and Sewer System Improvements
Post-Bid
Ruidoso, NM

To'Hajiilee Water System Improvements Project
Results
Laguna, NM 87026

Water System Improvements - Phase III
Post-Bid
Melrose, NM

Mountain View Waterline Extension
Results
$500,000 to $700,000 est. value
Moriarty, NM 87035

Reported 05/18/2022 12:00 AM
Project Title

Lower Arroyo Hondo MDWCA Water System Improvements Project

Physical Address View project details and contacts
City, State (County) Arroyo Hondo, NM   (Taos County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of demolition of the existing well house, construction of a new well house, replacement of existing well house infrastructure and piping, installation of approximately 2,019 linear feet (LF) of 8-inch PVC waterline (by open trench), 1,155 LF of 8-inch PVC waterline (by horizontal directional drilling (HDD), SR 522 and CR B005 crossings (by jack and bore), Rio Hondo River crossing (by HDD), valves, fire hydrants, water meters and appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents