Similar Projects
Sugar Bear Drive Sanitary Sewer Pipe Repairs and Scott Street Utility Repairs
Post-Bid
Safety Harbor, FL

Private Lateral Line Rehabilitation Project
Post-Bid
Saint Petersburg, FL 33731

2018 Sewer Point Repair and Improvements
Results
$1,000,000 to $5,000,000 est. value
Clearwater, FL 33755

Service Line Warranty Program - Utilities - Co-Op
Term Contract
Results
FL

Grease Waste Piping Renovations
Post-Bid
Less than $200,000 est. value
Clearwater, FL 33759

102nd Avenue and Bryan Dairy Road Sewer Lining Project
Results
Less than $812,614 est. value
FL

North Bayshore Sanitary Sewer and Force Main Replacement Project
Results
Less than $1,490,000 est. value
Safety Harbor, FL

San Priority Area Repair and Replace
Results
$3,600,000 est. value
Saint Petersburg, FL

Pump Station 016\Park Boulevard Force Main to South Cross Bayou Replacement
Results
Less than $16,745,920 est. value
Pinellas Park, FL 33781

Sewer Interceptor Rehabilitation - 94th Avenue to 86th Avenue and 86th Avenue to Pump Station 069
Results
Less than $1,218,025 est. value
FL

Manhole Rings, Covers, and Related Products
Results
Clearwater, FL 33758

Lift Station 3 Sanitary Sewer Force Main Replacement Project
Results
Less than $290,000 est. value
Dunedin, FL 34698

Annual Sanitary Sewer Repair and Extension
Term Contract
Results
Less than $400,145,650 est. value
Clearwater, FL 33755

Sewer Interceptor Rehabilitation - North Lake Seminole (Pid # 002747E)
Results
$547,896 est. value
FL

Maintenance Services Sanitary Sewer Cleaning
Results
Saint Petersburg, FL 33731

Last Updated 01/02/2019 11:05 AM
Project Title

J--Grease Trap Cleaning Service

Physical Address View project details and contacts
City, State (County) Bay Pines, FL 33744   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Contractor shall furnish all labor, supplies, equipment and material capable of handling the pumping, cleaning, removal and transportation for disposal at the Bay Pines VA Health Care System. The contractor is required to pump out and remove all water, grease, garbage and other matter that has accumulated from five (5) grease traps and four (4) lift stations in accordance with the schedule. The contractor shall scrape and/or use high pressure water to remove grease and residues from trap, pit walls, and/or associated piping/equipment. The contractor shall ensure unrestricted flow and proper operation of grease traps, inspect for any damage and notify the Point of Contact (POC) immediately of suspected damage.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents