Similar Projects
Bayou Concrete - Four Points Way / Tallahassee
New Construction, Infrastructure
Conception
Tallahassee, FL 32305

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Woodward Avenue Improvements
Infrastructure
Post-Bid
Tallahassee, FL 32304

Welaunee Boulevard Segment 3B Construction Project
Results
Tallahassee, FL 32308

Betton Road Traffic and Pedestrian Enhancement Project and Hickory and Spruce Water Main Improvements
Results
Less than $3,678,098 est. value
Tallahassee, FL 32301

Add Lanes and Reconstruct/Drainage Improvements/Base Work/Bridge Construction/Clearing and Grubbing
New Construction, Infrastructure
Post-Bid
$64,267,058 est. value
Tallahassee, FL 32318

Richview Road Pass Construction Project
Term Contract
Results
$3,500,000 est. value
Tallahassee, FL 32301

Resurfacing
Results
$6,879,936 est. value
FL

Apalachee Regional Park Entrance and Other Miscellaneous Improvements Project
Results
Less than $900,000 est. value
Tallahassee, FL 32311

Pine Forest Drainage Improvements Project
Results
Tallahassee, FL

Smith Creek Bike Lane Additions - Phase I and Phase II
Results
Tallahassee, FL 32310

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Old Bainbridge Road Safety Improvements from I-10 to Capital Circle NW
Infrastructure
Results
Tallahassee, FL 32318

6th Avenue Pedestrian and Roadway Modifications
Infrastructure
Results
Tallahassee, FL 32303

Road Capping at Apalachicola River Wildlife and Environmental Area (ARWEA)
Infrastructure
Results
Tallahassee, FL

Last Updated 06/28/2022 11:15 PM
Project Title

Shoulder Rework

Physical Address View project details and contacts
City, State (County) FL   (Leon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $638,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists Of Restoring The Original Template Of Roadside Shoulders And Ditch Bottoms To Maintain Positive Drainage And Ditch Capacity, Remove Soil And Vegetation From Miscellaneous Asphalt Guardrail Pads, And Maintain Grades Along Edges Of Curb And Sidewalk. Section 0001 Rework Nonpave Shoulder (Ac) e999- 10- 41 Maintenance Lump Sum Contract Ls 1.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents