Similar Projects
Alewife Creek Habitat Enhancement Project
Infrastructure
Sub-Bidding
$250,000 CJ est. value
Southampton, NY 11968

Hazardous Waste Materials Disposal
Alteration
Post-Bid

Soil Disposal At 29 LNA Sites
Term Contract, Alteration
Post-Bid

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

2022 Invasive Vegetative Control And Removal
Term Contract
Results
Hampton Bays, Southampton, NY 11946

Soil Disposal At Four (4) LNA Sites
Alteration
Post-Bid

Controlled Demolition with Asbestos in Place
Demolition, Infrastructure
Results
Wyandanch, NY 11798

Yaphank Correctional Facility Administration Area Demolition
Demolition, Infrastructure
Post-Bid
$60,000 CJ est. value
Yaphank, NY 11980

Controlled Demolition with Asbestos in Place
Demolition
Results
West Babylon, NY 11704

Controlled Demolition With Asbestos in Place
Term Contract, Demolition, Infrastructure
Post-Bid
$100,000 CJ est. value
West Babylon, NY 11704

HQ Fire Alarm Replacement and Sprinkler System Installation
Alteration
Results
Sound Beach, NY 11789

Controlled Demolition With Asbestos in Place
Demolition, Infrastructure
Post-Bid
$100,000 CJ est. value
Deer Park, NY 11729

Pilgrim Psychiatric Center Buildings 3 and 82 Envelope Upgrades and HAZMAT Abatement
Renovation, Alteration
Results
$3,264,107 to $3,840,125 est. value
Brentwood, NY 11717

Roth Property Demolition
Demolition, Infrastructure
Post-Bid
$50,000 CJ est. value
East Hampton, NY 11937

2017 Bond Issue Phase 10
Renovation
Results
$1,250,385 CJ est. value
Lindenhurst, NY 11757

Last Updated 06/23/2023 08:32 AM
Project Title

Demolition of the Sill's Farm Buildings

Physical Address View project details and contacts
City, State (County) Greenport, NY 11944   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $160,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The goal of this project is to successfully abate (lead and asbestos) and demolish three (3) dilapidated building structures and demolish a concrete silo structure at Pipes Cove Preserve in Greenport. Access to the work site is challenging based upon the low-lying, environmentally sensitive surrounding area. The Contractor is to have experience and the sensitivity of working around freshwater and tidal wetlands, a comprehensive understanding/experience of 6NYCRR Part 56 regulations, an understanding of working around and in coordination of an active railroad and lastly a profound respect for a historical nature preserve that serves the residents and visitors of Southold Town. As stated earlier access and the limited footprint to conduct demolition operations is the most challenging aspect to this project. The first 1000' feet of the access-way from NY-25 is wide enough for a small truck, small to mid-size construction equipment (backhoe, loader, roll-off truck) and then the roadway narrows down to a path that is soft and yielding due to its proximity to the groundwater table. The surrounding areas off this road/path are wetlands and perched groundwater bodies. The path continues along the west side of the pond which will need to be enhanced with a filter fabric and crushed stone road bed in order to accommodate the construction vehicles/equipment. The LIRR issued an entry permit which is part of this bid package that outlines all of the responsibilities of the Contractor to traverse safely over the LIRR tracks in strict compliance to the entry permit. There was a roadway that once existed on the south side of the railroad (see plans for details) that needs to be restored since the area has become overgrown. All abatement and demolition activities associated with this project will need to be conducted in accordance with the NYSDEC Wetland Permit, LIRR Entry Permit as well as all conditions included in the contract document. The Contractor shall include any and all provisions and costs associated with compliance to the permits obtained for this project and Southold Town requirements. Once all material has been properly removed from the site, the staging areas, footprints of all removed structures and pathways will be restored in accordance with the plans and specifications. The contractor shall possess all certifications and qualifications required to handle and transport the material (construction debris, ACM/Lead materials) to a permitted facility. All tracking documents and manifests will be provided as well as all notifications to local and State regulatory agencies. The Contractor should be aware that Pipes Cove Preserve will be temporarily shut down to the public during this project. However, this does not relieve the Contractor in any way of their contractual and regulatory obligations to protect the surrounding environment (air, soil, water) from contamination and the public's safety (LIRR, entry into site). Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Disadvantaged Owned Sub-Contracting Goal: 0% Contract term: Date of award to 60 calendar days from start of work

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents