Similar Projects
Lift Station No. 2
Bidding
TX

WWTP Lift Station
New Construction
Bidding
TX 77356

KOA Lift Station
Post-Bid
$650,000 to $680,000 est. value
Montgomery, TX 77356

Mackenzie Creek Section 2 Lift Station
Post-Bid
Conroe, TX 77301

Lift Station No. 1 Improvements
Results
$850,000 est. value
TX

Construction of the Lift Station No. 1
Results
Conroe, TX

Lift Station No. 13 Rehabilitation - SJRA Woodlands Division
Post-Bid
Less than $1,790,000 est. value
The Woodlands, TX

Sanitary Sewer Lift Station No. 2
Results
Montgomery, TX

Construction of Regional Lift Station and Local Lift Station Number 2 for Chapel Run
New Construction
Post-Bid
TX

Construction Services for Lift Station No. 4 Road and Grading
Results
Less than $56,417 est. value
The Woodlands, TX

Sanitary Sewer Lift Station for Audubon Magnolia Development
Post-Bid
Conroe, TX

Lift Station C Replacement
Results
Porter Heights, TX

Temporary Lift Station
New Construction
Post-Bid
TX

Conroe Industrial Park Utilities Sanitary Sewer Lift Station
Results
Less than $788,000 est. value
Conroe, TX 77301

Construction of the Woodforest Lift Station No. 6
Results
TX

Last Updated 04/13/2021 01:01 PM
Project Title

Lift Station Consolidation Area 3 and Camp Silver Springs Lift Station Expansion

Physical Address View project details and contacts
City, State (County) Conroe, TX 77301   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consolidation of two existing lift stations by installing approximately 2,300 linear feet of 12-inch and 15-inch gravity sanitary sewer along Seven Coves Road and US 75 within the City of Conroe. This also includes the installation of two new lift stations with 4,800 linear feet of 6-inch and 12-inch force main via open cut and trenchless. The CONTRACTOR shall furnish labor, equipment, materials, supervision, insurance, bonds, etc. to construct operational gravity sanitary sewer, force main, and lift stations, complete in place in accordance with the Drawings, Details and Specifications, using premier materials and workmanship to the standard of the City of Conroe.

Details

Lift and Pump Stations, Build-Out.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents