Similar Projects
Classroom and Storage Facility at Firehouse #2 - City of Alabaster
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Alabaster, AL 35007

Pump Station #19 Force Main Replacement - City of Alabaster
Infrastructure
Conception
$350,000 CJ est. value
Alabaster, AL 35007

Montevallo Water Treatment Plant - Residential and Commercial Water Meters
Infrastructure
Design
$9,500,000 CJ est. value
Montevallo, AL 35115

District 31 Shopping Center - Phase 1 & 2
New Construction, Infrastructure - 350,000 SF
Design
$75,000,000 CJ est. value
Alabaster, AL 35007

Inverness Center Drive Sidewalk Phase I
Infrastructure
Bidding
$400,000 CJ est. value
Hoover, AL 35242

Inverness Center Drive Sidewalk Phase I
Infrastructure
Bidding
$400,000 CJ est. value
Hoover, AL 35242

American Village Independence Hall & Congress Hall Project
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Montevallo, AL 35115

Oak Mountain Trail Mass Grading
Infrastructure
Post-Bid
Pelham, AL

Parking Lot Improvements to Creekview Elementary School
Results
Alabaster, AL 35114

2021 Roadway Paving Improvements
Infrastructure
Results
$792,732 est. value
Alabaster, AL

Ascension St. Vincent's McCain Parkway Hospital
New Construction, Infrastructure - 40,000 SF
Pending Verification
$35,000,000 CJ est. value
Pelham, AL 35124

Blackridge South Phase 1
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hoover, AL 35080

Alabaster Boulevard Improvements & Connector Road Construction - City of Alabaster
Infrastructure
Conception
$300,000 CJ est. value
Alabaster, AL 35007

$PRESS - Police Station - Williams Blackstock Architects
New Construction, Infrastructure - 35,000 SF
Design
$12,000,000 CJ est. value
Alabaster, AL 35007

Phase II Completion of Loop #1 - Conversion of Electrical Power Distribution System to 15KV
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Montevallo, AL 35115

Last Updated 11/30/2022 03:14 PM
Project Title

RFQ Contractor - Applecross Pump Station Improvements Project

Physical Address View project details and contacts
City, State (County) Hoover, AL 35242   (Shelby County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $685,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be bid on is as follows: All labor, materials, labor, services, and equipment necessary for completion of the following items: Mobilization and demobilization in accordance with Section 01 05 05 - Mobilization and Demobilization Abandonment of existing "can" pump station Removal and replacement electrical equipment Rehabilitation and installation of monolithic lining of existing wet well Installation of packaged pump station, piping, pumps and appurtenances, and precast concrete vault Installation of aerial metal work platform, railing, and access stairs Installation of asphalt parking area and retaining walls Site clearing, grubbing, and grading Connection to existing force main and installation of new plug valve and wye connection All associated site work, erosion and sediment control, and return of any disturbed areas to preexisting condition The allotted time for construction is 150 days to Substantial Completion, and 180 calendar days to Final Acceptance. No bid may be withdrawn within 60 days after the bid opening date. Any questions must be submitted to Gresham Smith by 5:00PM on November 21, 2022. A Bid Bond in an amount of not less than five percent (5%) of the total amount Bid (not to exceed $10,000) must accompany each proposal. The payee of such bond shall be The City of Hoover, Alabama. The Bid Bond shall bear the same date as set for the receipt of Bids. The Bid Bond shall be signed by an agent authorized to do business in the State of Alabama. The Owner reserves the right to waive any informality or to reject any and all bids.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents