Similar Projects
Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Shoulder Widening, Pipe Work, Spot Grading; Replace Str (RCBC), Approach Grading
Infrastructure
Conception
$23,015,000 CJ est. value
Rapid City, SD 57702

Block 5 Project
New Construction, Infrastructure - 5,000 SF
Design
$60,000,000 CJ est. value
Rapid City, SD 57701

Block 5 Project
New Construction, Infrastructure - 5,000 SF
Design
$60,000,000 CJ est. value
Rapid City, SD 57701

Spot Grading, AC Surfacing
Infrastructure
Bidding
$8,494,000 CJ est. value
East Central Pennington, SD 57725

Spot Grading, AC Surfacing
Infrastructure
Bidding
$8,494,000 CJ est. value
East Central Pennington, SD 57725

Tarmac Repair
Infrastructure
Post-Bid
Rapid City, SD 57703

RFP D/B - Architectural and Engineering Services, Mineral Industries Building
New Construction, Infrastructure
Post-Bid
$34,000,000 CJ est. value
Rapid City, SD 57701

Saint Patrick Street Reconstruction
Results
$955,000 est. value
Rapid City, SD 57701

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Liberty Plaza Mixed Use
New Construction - 450,000 SF
Construction
$110,000,000 est. value
Box Elder, SD 57719

Superpumper Addition
New Construction, Infrastructure - 22,800 SF
Pending Verification
$14,300,000 CJ est. value
Rapid City, SD 57701

Rushmore Center
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Rapid City, SD 57701

Grading, Interchange Reconstruction, PCC Surfacing
Infrastructure
Conception
$33,216,000 CJ est. value
New Underwood, SD 57761

Sunburst Drive Reconstruction
Infrastructure
Design
Rapid City, SD 57702

Last Updated 10/28/2022 02:32 PM
Project Title

Cliffside Park Bridge Reconstruction - South Dakota Department of Transportation

Physical Address View project details and contacts
City, State (County) Rapid City, SD 57701   (Pennington County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $5,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project work includes replacing the Cliffside Park bridge adding sidewalks. As of October 28, 2022, this project is in the conceptual phase. Information regarding a design team and the contractor selection has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2026. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents