Similar Projects
Archery Park Water Line
Post-Bid
Ogden, UT 84401

3900 South Waterline Improvement Project
Post-Bid
Less than $174,155 est. value
Riverdale, UT 84405

DFCM Construction-DOC AP and P NUCCC Repipe Potable Water Pipes and Sewer Lines
Results
$829,370 est. value
Ogden, UT 84401

Apple Grove Water Main Upgrade
Results
Ogden, UT 84404

2550 South Phase 3 Improvement Project
Post-Bid
West Haven, UT 84401

Regency Drive Waterline Replacement
Results
Less than $198,270 est. value
Ogden, UT 84403

River Bottom Improvement Project Prequalification
Post-Bid

Pierce Water Connections
Results
$2,500,000 est. value
Ogden, UT 84401

200 South Waterline Project
Post-Bid
Marriott-Slaterville, UT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

1975 North Waterline Project
Post-Bid
$500,000 est. value
Plain City, UT

Washington Boulevard 700 North Waterline Project
Results
Less than $496,094 est. value
Harrisville, UT 84404

Storm Water Improvement Projects
Post-Bid
$257,500 est. value
Riverdale, UT

700 South and 1200 West CDBG Project
Results
Less than $446,804 est. value
Marriott-Slaterville, UT 84404

400 East Waterline Replacement
Results
$478,960 to $598,773 est. value
North Ogden, UT 84414

Last Updated 05/07/2021 08:26 AM
Project Title

2021 Waterline Replacement and Storm Drain Project

Physical Address View project details and contacts
City, State (County) North Ogden, UT   (Weber County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,156,175
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing approximately 3,550 lineal feet of 8" PVC C900 waterline, 200 lineal feet of 4" PVC C900 waterline, along with valves, fire hydrants, copper services, and blow-off valves. The Project also includes construction of approximately 1,150 lineal feet of 15" RCP storm drain, with manholes, catch basins, and connection to an existing culvert.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents