Similar Projects
Add/Repair Base Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Shaw Air Force Base, SC 29152

Carolina Crossroads Phase 2 - Broad River Road at I-20 Interchange
Bidding
SC

Old Garners Ferry Road Improvements
Bidding
Columbia, SC 29209

FP On-Call CPP Full Depth Patching
Term Contract
Post-Bid
SC

State Street Resurfacing FY 19/20
Post-Bid
Sumter, SC 29151

Interstate 26 Widening MM 85-101
Results

Paving of Industrial Road/High Street - CTC 2019
Results
Sumter, SC 29150

Safety Improvements I-20 District1
Bidding

Wildewood Subdivision Paving
Post-Bid
SC

North Springs and Harrington Intersection Improvement
Results
Less than $960,931 est. value
Columbia, SC 29204

Manning Road Fire Station Driveway Replacement
Bidding
Sumter, SC 29150

Grier Street Road Improvements
Post-Bid
Sumter, SC 29150

Anderson Court and Brazell Lane Paving Projects
Results
Elgin, SC

County Line Trail Roadway Improvements
Bidding
$500,000 to $749,999 est. value
Columbia, SC

Asphalt and Concrete Repair and Restoration (IDC)
Post-Bid
$179,681 est. value
Columbia, SC

Last Updated 02/10/2021 11:18 PM
Project Title

Preservation - District 1

Physical Address View project details and contacts
City, State (County) (Kershaw, Lee, Richland, Sumter Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PCN: P040136 Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 75.000 Sy Borrow Excavation 568.000 Cy Maintenance Stone 11.300 Ton Liquid Asphalt Binder Pg64-22 210.606 Ton Full Depth Asph. Pav. Patching 6" Unif. 1,130.000 Sy Milling Existing Asphalt Pavement 1.5" 2,500.000 Sy Milling Existing Asphalt Pavement (Variable) 1,920.000 Sy Milled-In Rumble Strip 5.680 Mi Hot Mix Asphalt Surface Course Type d 3,196.083 Ton Preventative Maintenance Surface Treatment 185,390.000 Sy Driveway Paving-Surface Type d 146.875 Ton Permanent Construction Signs (Ground Mounted) 2,928.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 3,180.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 302,710.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 1,760.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 2,438.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 16.000 Ea White Word Message "Only"-Fast Dry Paint 2.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 68,700.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 185,200.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 330.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 920.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 120,995.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 880.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Thermo-125mil 35.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 735.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 8.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 1.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 8,170.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 79,320.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 17.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 70.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,055.000 Ea 4" White Broken Lines- (Gaps Excld) - Single Component Hybridized Polymer– 20 Mils 850.000 Lf 4" White Solid Lines-(Pavement Edge Lines)-Single Component Hybridized Polymer–20 Mils 37,160.000 Lf 24" White Solid Lines-(Stop/Diagonal Lines)-Single Component Hybridized Polymer–20 Mils 664.000 Lf 4" Yellow Broken Lines (Gaps Excluded) - Single Component Hybridized Polymer - 20 Mils 780.000 Lf 4" Yellow Solid Lines (Pavement Edge & No Passing Zone) - Single Component Hybridized Polymer - 20 Mils 45,430.000 Lf Detectable Warning Material 37.500 Sf Pedestrian Ramp Construction 75.000 Sy Surface Applied Detectable Warning 110.000 Sf Remove & Dispose Semi-Rigid Gr Device 200.000 Lf Mt3 Leading End Treatment Tl3 4.000 Ea Permanent Grassing For Non-Permitted Resurfacing Projects 2.754 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents