Similar Projects
Logistics Facility Heating, Ventilation and Air Conditioning (HVAC) Replacement, Kennedy Space Center, Fl.
Bidding
$1,000,000 to $5,000,000 est. value
Cape Canaveral, FL

Hoods and Duct Cleaning Maintenance and Repair PASFB
Term Contract
Bidding
Patrick AFB, FL

Altha Public School Miscellaneous Projects
Post-Bid
Altha, FL 32421

Santa FE High School Gym HVAC Replacement, Building 12
Post-Bid
Alachua, FL 32615

Construct HV Duct Bank, Trident MACA
Results
$1,000,000 to $5,000,000 est. value
Cape Canaveral, FL 32920

Heating, Ventilation, and Air Conditioning (HVAC) Recommissioning and Energy Optimization Services - AFCEC, Tyndall AFB, FL
Results
Panama City, FL 32405

Air Conditioning Unit Replacement - D.B. Lee Water Reclamation Facility
Alteration
Bidding
Melbourne, FL 32935

N059--FY20: Hot Deck Replacement
Post-Bid
Gainesville, FL 32608

Biological Control Rearing Facility (BCRF) HVAC Controls Upgrade
Results
Less than $199,480 est. value
Gainesville, FL 32608

HVAC Preventative Maintenance, Repairs, and Replacement
Alteration
Bidding
Davie, Plantation, Southwest Ranches, FL 33314

BPS Longleaf Elementary School Chiller
Post-Bid
Melbourne, FL 32935

Fire Station Air Purification Systems
Results
$240,000 est. value
Melbourne, FL 32935

HVAC Renovations at Patronis Elementary School
Alteration
Bidding
Panama City, FL 32408

Kitchen Exhaust Hood Cleaning Services
Post-Bid
FL

Rooftop Vent Replacements
Results
Less than $75,137 est. value
Panama City, FL 32404

Last Updated 06/04/2021 08:15 AM
Project Title

Replace AC System in the Old Courthouse

Physical Address View project details and contacts
City, State (County) Blountstown, FL 32424   (Calhoun County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace existing Trane 15-ton split AC system with a new Trane Unit for the 2nd floor of the Old Courthouse: 1. Disconnect any energy source including power and lock-out. 2. Pump down and remove existing 15-ton condenser. 3. Disconnect and remove existing Air Handler Unit (AHU) in the attic. 4. Disconnect and remove all existing electrical wiring, control wiring, refrigerant lines, drain lines and duct work in the attic. 5. Set new AHU in back room in up-flow configuration. 6. Remove and Replace all existing ductwork. 7. Restore all existing connections. 8. Install new condenser in the location of removed existing condenser. 9. Run, verify and balance proper operation of system. 10. Clean Work Area

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents