Similar Projects
Bituminous Concrete
Infrastructure
Bidding
Chinchilla, PA

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Bidding

Mundro Road Paving
Post-Bid
Olyphant, PA 18447

Walsh Plaza Development Pa38-18 Phase 1 - Pavement Rehabilitation
Post-Bid
Olyphant, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

STEA - Replace Receiver Track
Results
$500,000 to $1,000,000 est. value
Scranton, PA 18503

2021 Road Paving
Post-Bid
Simpson, PA

Clarks Green Borough Paving Project 2020
Results
Clarks Green, PA 18411

General Construction
Post-Bid
Scranton, PA 18507

Construction Project, CSS# 6071 Seal Asphalt and Stripe
Results
$100,000 to $250,000 est. value
Dunmore, PA 18509

2021 Paving Project
Infrastructure
Post-Bid
Dickson City, PA 18519

Milling of Bituminous Superpave Scratch and Leveling Course
Results
Simpson, PA 18407

Paving Project 2021
Infrastructure
Post-Bid
Clarks Green, PA

Repair Work Burns Road
Results
Forest City, PA 18421

Mc Andrew Road Roadway Improvement Project
Infrastructure
Post-Bid
Moscow, PA 18444

Last Updated 03/05/2022 07:39 AM
Project Title

Taylor Borough South Pond Street Improvement Project - Phase I

Physical Address View project details and contacts
City, State (County) Taylor, PA 18517   (Lackawanna County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to replace the existing asphalt pave roadway surface along the length of South Pond Street, to West High Street. This project will mill the existing damaged pavement structure, being the pavement top course. Once milled, the roadway base pavement will be inspected, and Base Repairs will be determined on an as needed basis. Concrete ADA curb ramps will be installed where necessary at the intersecting roadways to provide for accessibility to the existing walks, as required. Existing manhole and storm inlet lids/grates will be adjusted to meet the proposed finished grades of the final roadway surface. Once completed, the proposed project, within the Phase 1 project area, will provide for a new, even roadway surface and ADA accessibility at the intersections.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents