Similar Projects
Wastewater Treatment Plant System Upgrade
Addition
Conception
$250,000,000 est. value
Sacramento, CA

Wastewater Treatment Plant Influent Barscreen - City of Brentwood
Renovation
Conception
$460,000 est. value
Brentwood, CA

California Waste Solutions Recycling Facility
New Construction - 170,765 SF
Design
$10,000,000 CJ est. value
Oakland, CA 94607

New River Improvement Project - Calexico Reach
Infrastructure, Renovation
Design
$41,734,276 CJ est. value
Calexico, CA 92231

SCWP - Secondary Treatment and Dewatering Project
Renovation
Bidding
$250,000,000 CJ est. value
Sunnyvale, CA 94087

Water Pollution Control Plant Dirt Relocation 2021
Infrastructure
Bidding
$4,000,000 CJ est. value
San Leandro, CA 94577

Biosolids Digester Facilities - T-05.02 Miscellaneous Metals Supply and Installation Package 2
Renovation
Sub-Bidding
$500,000 CJ est. value
San Francisco, CA 94103

Hydrochloric Acid for the Otay Water Treatment Plant
Term Contract
Sub-Bidding
San Diego, CA 92101

City Distribution Division Campus at 2000 Marin
New Construction, Demolition
Post-Bid
$225,000,000 est. value
San Francisco, CA 94124

Process Control Systems Integrator (PCSI) Supply and Installation
New Construction
Post-Bid
San Francisco, CA

Biosolids Digester Facility - Building 610 Wave 1
New Construction
Results
$939,000,000 est. value
San Francisco, CA 94124

Water Pollution Control Plant Building 042 Primary Clarifier Improvements
Renovation
Results
$6,500,000 to $7,000,000 est. value
San Francisco, CA

Wastewater Collection System Maintenance Manhole Installation
Renovation
Construction
$79,960 CJ est. value
Galt, CA 95632

RFQ Contractor - Biosolids Digester Facilities - T-08.02: Overhead Coiling Doors
Renovation
Pending Verification
$900,000 CJ est. value
San Francisco, CA 94103

RFQ Contractor - Biosolids Digester Facilities - T-33.03: Yard Piping B600 Laterals
Renovation
Pending Verification
$2,500,000 CJ est. value
San Francisco, CA 94103

Last Updated 08/10/2022 05:01 PM
Project Title

Headworks Facility Replacement - WQ-16002 - City of Palo Alto

Physical Address View project details and contacts
City, State (County) East Palo Alto, CA 94303   (Santa Clara County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $43,996,900 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides funding for replacing influent pumping, including the suction and discharge piping, pipe manifolds, valves, the electrical and controls system, screening equipment, grit handling equipment, the force main to the primaries and modifying headworks building, and yard piping. Project is included in the City of Palo Alto's FY 2023 - 2027 CIP. As of August 10, 2022, information regarding a design team or a general contractor is not available. Construction is anticipated in FY 2026.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents