Similar Projects
Pulpit Rock Inn
New Construction - 34,685 SF
Conception
Warwick, NY 10990

Culinary Check In-Institute
New Construction
Conception
$98,000,000 est. value
Hyde Park, NY 12538

Elmwood Preserve Senior Housing
New Construction
Design
Greenburgh, NY 10607

Mamaroneck Avenue Apartments
New Construction - 2,101 SF
Design
$100,000,000 to $125,000,000 est. value
White Plains, NY 10605

Municipal Pool Repairs
Bidding
Chateaugay, NY 12920

High School Pool Project
Post-Bid
Less than $3,200,000 est. value
Corning, NY 14830

Installation of New PVC Pool Membranes at Highland Park and West Endicott Park
Post-Bid
Endwell, NY 13760

2016 Capital Project - Middle School Pool
Results
$1,000,000 to $2,000,000 est. value
Delmar, NY 12054

Elm Avenue Park – Outdoor Pool Complex Dive/Slide Pool Construction
Results
$650,000 to $950,000 est. value
Delmar, NY 12054

42 Broad Street West - Fleetwood
New Construction - 354,000 SF
Construction
$95,000,000 est. value
Mount Vernon, NY 10550

Watermark Pointe
New Construction
Construction
$100,000,000 est. value
New Rochelle, NY 10801

Halfmoon Heights Community Center
New Construction - 2,200 SF
Pending Verification
Clifton Park, NY 12065

Liberty Mixed Use
New Construction, Renovation, Addition
Pending Verification
Liberty, NY 12574

Highview II Milton Street Residential
New Construction
Conception
Poughkeepsie, NY 12601

South Broadway Hotel
New Construction
Design
Saratoga Springs, NY 12866

Reported 03/18/2020 12:00 AM
Project Title

Replacement Vinyl Pool Liner at Congers Memorial Park

Physical Address View project details and contacts
City, State (County) Congers, NY 10920   (Rockland County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work under this section consists of the installation of a reinforced PVC membrane lining system specifically designed and formulated for use in swimming pools. The General Contractor shall furnish all labor, materials, equipment, appliances, services, and perform the operations as detailed herein to complete the installation of the system in the existing Main Pool at Congers Lake Park. Work Included 1) It is the intent of this specification to describe a flexible, polyester reinforced PVC membrane lining system designed to contain water. The lining shall consist of two layers of flexible PVC totally encapsulating a polyester inner reinforcement. The sections of material shall be fuse bonded together at the site to form a watertight continuous membrane lining. 2) This specification includes, but is not limited to, the following components: flexible PVC membrane, smooth reinforced PVC membrane, textured slip- resistant reinforced PVC membrane; black color reinforced PVC membrane for use at targets, racing lanes and pool tread/nosing markings; separator fleece, PVC laminated steel edging and sheets, galvanized steel edging and sheets, sanitizing agents, transition flanges, and edge sealants. 3) The Contractor shall remove and replace all miscellaneous pool equipment items, as needed to properly install the PVC liner.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents