Similar Projects
Anderson VR Center Reroofing
Alteration
Bidding
$550,000 to $650,000 est. value
Anderson, SC

Sumter VR Center Reroofing
Alteration
Bidding
$325,000 to $425,000 est. value
Sumter, SC 29153

Roof Replacement Project at Greenville Middle Academy
Post-Bid
Greenville, SC 29607

SC Department of Archives and History - Roof Insulation and Protective Coating
Post-Bid
$300,000 to $375,000 est. value
Columbia, SC 29232

Admin Roof Replacement - John de la Howe School
Results
$400,000 to $500,000 est. value
McCormick, SC 29835

Reroofing Construction Project - SCGSAH
Results
$400,000 to $550,000 est. value
Greenville, SC 29601

Roofing Replacement/Repair
Alteration
Bidding
Less than $50,000 est. value
Florence, SC

DPS/DMV Warehouse Roof Retrofit
Post-Bid
$310,000 to $330,000 est. value
Blythewood, SC 29016

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Charleston-Fort Johnson Roof Replacements Phase 2
Alteration
Bidding
$300,000 to $400,000 est. value
Charleston, SC

Indefinite Delivery Contract - Roofing Services
Post-Bid
Charleston, SC 29401

Town Hall Roof Replacement and Ceiling Repair
Results
Less than $33,399 est. value
McClellanville, SC 29458

Spartanburg School District 6 Roofing Projects
Alteration
Bidding
Spartanburg, SC

Roofing/HVAC Replacement - Richland Northeast High School
Post-Bid
Columbia, SC 29223

Roof Repairs to the Bailey Municipal Center
Results
$58,000 est. value
Clinton, SC 29325

Last Updated 08/20/2021 11:43 AM
Project Title

Burroughs and Chapin Bldg. Re-Roofing

Physical Address View project details and contacts
City, State (County) Conway, SC 29526   (Horry County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal / disposal of existing metal R-Panel roofing assembly, metal flashings, designated damaged Z-purlins, gutter and downspouts; Prep. to the existing metal building frame incl replacing deteriorated or missing vinyl backed FG batt insulation & designated Z-purlins; & the new installation of a snap lock trapezoidal roof panel assembly, aluminum equipment curbs with integrated upslope crickets, gutters and downspouts, & all associated fasteners, flashings, & accs

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents