Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Spruce Avenue Commerce Center
New Construction - 70,000 SF
Design
$38,000,000 est. value
Rialto, CA 92376

Starbucks / San Bernardino
New Construction, Infrastructure - 1,001 SF
Bidding
$750,000 CJ est. value
Highland, CA 92346

Construction of Simulation Center
New Construction, Infrastructure - 70,000 SF
Bidding
$100,000,000 CJ est. value
Fort Irwin, CA 92310

O'Reilly Auto Parts #2 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

O'Reilly Auto Parts #2 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Replace Pcc and Ac Pavement With Jpcp and Hma Pavement
Infrastructure
Results
CA

Saw Cutting, Asphalt Repair/Replacement, Slurry, and Paving
Infrastructure
Results
Yucaipa, CA 92399

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

Welding Instruction Facility
New Construction
Pending Verification
$2,900,000 est. value
Fontana, CA 92335

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Pending Verification
$275,000,000 CJ est. value
Redlands, CA 92373

Rathbun Creek Trailhead Restroom and Parking Lot - City of Big Bear Lake
Infrastructure
Conception
$660,000 est. value
Big Bear Lake, CA

Primrose Street Cannabis Facility
New Construction - 213,000 SF
Design
$23,000,000 est. value
Adelanto, CA 92301

Last Updated 09/21/2022 10:13 AM
Project Title

Hesperia Commerce Center Distribution And Industrial Park - Remaining Phases

Physical Address View project details and contacts
City, State (County) Hesperia, CA 92345   (San Bernardino County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $235,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for the remaining phases, for information on the first phase, please see Hesperia Commerce Center Distribution And Industrial Park - Phase 1 Phase II Option A Buildings 3 & 5 @ 1,137,180 Square Feet With 416 Parking Spaces, Or Option B Building 3 2 498,400 Square Feet With 251 Parking Spaces ($80M) Phase III Option A Buildings 4 & 6-10 ($90M) Phase IV Option A & B Building 11-25 @ 226,205 Square Feet With 642 Vehicle Parking ($35M) Phase V Option A & B Buildings 28-32 @ 155,803 Square Feet With 274 Vehicle Parking ($30M)

Details

,, 2,017,588 SF - 1,137,180 SF, 416. 498,400 SF, 251. 226,205 SF, 642. 155,803 SF, 274.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents