Similar Projects
HVAC Preventative Maintenance Services, NWS Romeoville, IL
Post-Bid
Romeoville, IL 60446

N041--25 Ton Chiller Replacement
Post-Bid
North Chicago, IL

HVAC Equipment Replacement
Results
Evanston, IL 60201

Boiler Replacement at Indian Trail JHS
Renovation
Results
Addison, IL 60101

Connect B1 W Penthouse to Central Chiller Plant
Post-Bid
Marion, IL 62959

IVCC Building G AHU Replacement
Results
Oglesby, IL 61348

J041--Marion VA Medical Center Annual York Chiller Inspection and Preventive Maintenance
Post-Bid
Marion, IL

DOC-Sheridan-Outdoor Chiller for C3
Results
Sheridan, IL 60551

HVAC Inspection, Analysis & Preventative Maintenance
Term Contract
Post-Bid
Rockford, IL 61104

2020 HVAC Replacement
Results
Wheeling, IL 60090

Club Fitness Roof and HVAC Replacement
Post-Bid
Addison, IL 60101

Hot Water Heater Replacement
Results
Rock Island, IL 61201

HVAC Services - Collinsville
Term Contract
Post-Bid
Collinsville, IL

Shawnee Community College Emergency HVAC
Renovation
Results
$75,000 to $100,000 est. value
Ullin, IL 62992

On Call HVAC Repair Services
Term Contract
Post-Bid
West Chicago, IL 60185

Last Updated 10/16/2020 03:51 PM
Project Title

Upgrade HVAC System

Physical Address View project details and contacts
City, State (County) Springfield, IL 62703   (Sangamon County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Heating & Air Conditioning - Remod & Rehab Demolish existing steam absorption chiller, chilled water pumps, and condenser piping. Install new chiller and condenser piping and remediate the existing cooling tower.

Details

Division 02 - Existing Conditions, Asbestos Remediation, Asbestos Abatement.
Division 08 - Openings, Metal Frames, Stainless-Steel Frames, Metal Doors, Stainless-Steel Doors, Door Hardware.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Vibration and Seismic Controls for HVAC, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Equipment Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, Control Valves, Direct-Digital Control System for HVAC, Electric and Electronic Control System for HVAC, Sequence of Operations for HVAC Controls, Hydronic Piping and Pumps, Hydronic Piping Specialties, Automatic Condensate Pump Units, HVAC Water Treatment, Water Treatment for Closed-Loop Hydronic Systems, HVAC Air Distribution, Packaged Water Chillers, Centrifugal Water Chillers, Cooling Towers, Forced-Draft Cooling Towers, Open-Circuit, Forced-Draft Cooling Towers, Central HVAC Equipment.
Division 26 - Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Low-Voltage Controllers, Enclosed Controllers, Variable-Frequency Motor Controllers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents