Similar Projects
ShipBob Fulfillment Centers Master Plan
New Construction
Conception
Chicago, IL 60607

Retail & Warehouse
New Construction
Conception
Chicago Ridge, IL 60415

Compass Global Logistics Hub
New Construction
Design
$1,700,000,000 est. value
Joliet, IL 60436

Amazon Warehouse
New Construction - 112,000 SF
Design
Chicago, IL 60654

Cold Storage Building
Post-Bid
Vermilion, IL 61955

Salt Dome Replacement Facility
Post-Bid
Chicago, IL 60612

Roosevelt And Kostner Development
New Construction
Results
Chicago, IL 60624

DNR-Rock Cut-Storage Building
Results
Loves Park, IL 61111

McMaster Carr Warehouse Expansion
Addition
Construction
Elmhurst, IL 60126

Four Seasons Storage Facility
New Construction
Construction
Shorewood, IL 60404

Warehouse Distribution Buildings & Associated Office
New Construction - 428,431 SF
Pending Verification
Palatine, IL 60067

Storage Facility Renovation
Renovation, Addition - 5,500 SF
Pending Verification
$150,000 est. value
Alton, IL 62002

Signode Corporate Headquarters
Renovation, Build-Out - 253,000 SF
Conception
$15,000,000 est. value
Elk Grove Village, IL 60007

Storage Buildings
New Construction, Demolition - 7,248 SF
Design
Less than $1,840,000 est. value
Farmington, Lewistown, Wyoming, IL

MCC Storage Building
New Construction
Post-Bid
Lombard, IL

Reported 06/15/2022 12:00 AM
Project Title

Public Works Salt Shed

Physical Address View project details and contacts
City, State (County) Kankakee, IL 60901   (Kankakee County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Agency's Affiliate - 05/31/22
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Kankakee is accepting bids from venders to provide materials, labor, and disposal services as outlined in the specifications and drawings for the demolition and reconstruction of the salt shed

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents