Similar Projects
South Harrison-Benson Connection - Village of Oswego
Infrastructure
Conception
$350,000 est. value
Oswego, IL 60543

Water Reclamation Chemical Phosphorus Removal Systems - 22A03 - North Shore Water Reclamation District
Infrastructure
Conception
$3,663,000 est. value
Gurnee, IL 60031

Wastewater Treatment Plant Replacement
New Construction
Design
Sterling, IL

RFQ Contractor - Terminal 5 Landside and Parking Improvements - Bid Package 8
Infrastructure
Design
$200,000 CJ est. value
Chicago, IL 60666

Resurface Pittsburg Road
Infrastructure
Bidding
$3,595,307 CJ est. value
Pittsburg, IL 62974

Water Main Replacement Project
Infrastructure
Bidding
$300,000 CJ est. value
Dolton, IL 60419

New Manhattan Junior High School - Bid Period 1
Infrastructure
Sub-Bidding
$85,000,000 CJ est. value
Manhattan, IL 60442

Bar Screen Replacement Project
Renovation
Post-Bid
Toluca, IL

2021 Site Improvements at Multiple Schools
Infrastructure
Post-Bid
Glenview, Niles, IL 60025

Site Improvements at Breiter-Palm Park
Infrastructure
Results
Bensenville, IL 60106

Urbana Middle And High School Site Improvements – Phase 1
Alteration
Results
$100,000 to $200,000 est. value
Urbana, IL 61801

Tuscany Station Mixed Use
New Construction
Construction
Oswego, IL 60543

210 N Aberdeen Mixed-Use
New Construction, Infrastructure - 10,700 SF
Construction
$140,000,000 CJ est. value
Chicago, IL 60607

Windsor Road Resurfacing
Infrastructure
Pending Verification
$300,000 CJ est. value
Urbana, IL 61801

Learn - Hunter Perkins School Addition
Addition, Demolition, Infrastructure - 54,336 SF
Pending Verification
$2,000,000 CJ est. value
Chicago, IL 60620

Last Updated 09/17/2022 01:01 AM
Project Title

Water Treatment Plant Filter Upgrades

Physical Address View project details and contacts
City, State (County) Gibson City, IL 60936   (Ford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the existing filtration equipment including filter media, valves, backwash equipment, and instrumentation and controls. General repairs to existing basins, piping and water treatment facility building

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents