Similar Projects
Victor View Gravity Sewer
Infrastructure
Bidding
Highland, UT

Golf Course Sewer Replacement
Post-Bid
Saratoga Springs, UT 84045

500 East 600 South Design
Post-Bid
Salem, UT 84653

2020 Sewer Lining Project
Results
Less than $100,000 est. value
Highland, UT 84003

West Interchange Sewer Trunkline Design and Construction Management
Term Contract
Results
$7,000,000 est. value
Spanish Fork, UT 84660

Pole Canyon Water Line and Force Main Sewer
Post-Bid
Eagle Mountain, UT

Mt. Vista Parkway Sewer Reroute 2020
Results
Provo, UT 84606

Drain Cleaning Services
Term Contract
Post-Bid
Draper, Ogden, Orem, Salt Lake City, West Valley City, UT 84020

2020 Water and Sewer Improvement Projects
Results
Provo, UT 84606

Sewer Lateral Reinstatement and Robotic System
Post-Bid
Orem, UT 84057

2020 Sewer Improvements
Results
Less than $430,050 est. value
Pleasant Grove, UT 84062

30" Sewer Cipp Lining
Post-Bid
Eagle Mountain, UT 84005

Canyon View and Ocampo Utility Improvements Project
Results
Less than $475,000 est. value
Payson, UT 84651

2020 Manhole Rehabilitation Project
Post-Bid
Eagle Mountain, UT

2050 North - 281 West - 300 West Sewer Replacement
Results
Less than $100,000 est. value
Spanish Fork, UT 84660

Last Updated 08/05/2021 09:25 AM
Project Title

Exchange Park Sewer Upgrade Project

Physical Address View project details and contacts
City, State (County) Provo, UT   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The location of the work is: between intersection of 500 North and 600 West and Exchange Park (approximately 601 Columbia Lane), Provo Utah. Work primarily consists of all the labor, materials, tools, and equipment necessary to construct approximately 4,170 linear feet of 8 to 27-inch sewer lines including 18 manholes, 70 lateral reconnections, 13 trench dikes, fittings, dewatering, etc. and other improvements. Construction of the Provo City Exchange Park Sewer Upgrade generally includes traffic control, locating existing utilities, potholing, protecting existing utilities, excavating/trenching, necessary shoring, dewatering, removing existing pipe, providing sewer flow during construction of upgraded line, installing sewer pipe and manholes, reconnecting existing sewer laterals, backfilling, grading, replacing asphalt, replacing of landscaping in the Exchange park, and other required items.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents