Similar Projects
Maritime Park Hurricane Sally Restoration
Infrastructure
Bidding
$525,000 est. value
Pensacola, FL 32502

Duval County Mile Point Waterway Marker Project
Term Contract, Infrastructure
Bidding
FL

Macdill AFB Marina Wet Slip Repair
Post-Bid
Macdill AFB, FL

MRD - 12Nov2020 - Installation of Waterways Signs, Lights and Pilings
Post-Bid
FL

Repair Waterfront and Storm Sewer Systems at U.S. Coast Guard Station Panama City, FL
Results
$500,000 to $1,000,000 est. value
Panama City, FL 32408

Lignumvitae Key Botanical State Park - Repair and Renovate Dock
Results
Islamorada, FL 33036

Tribute by Marriott
New Construction
Construction
$12,000,000 est. value
Saint Augustine, FL 32080

The Wharf
New Construction - 11,982 SF
Construction
$965,056 est. value
Saint Augustine, FL 32084

Earl Gilbert City Park - Oakshore Drive Fishing Pier
Infrastructure
Bidding
$2,200,000 est. value
Panama City, FL 32404

Repairs to East Side of Pier Railing
Post-Bid
Deerfield Beach, FL 33441

Nicks Park Boat Ramp Rehabilitation Project
Results
Port Richey, FL 34668

Latitude Margaritaville Watersound Amenities, Phase 1 & 2
New Construction - 34,862 SF
Construction
$30,000,000 est. value
WaterSound, FL

North Central Region Waterway Marker Project
Infrastructure
Bidding

CT5 Mooring Improvements
Post-Bid
$2,000,000 est. value
Cape Canaveral, FL 32920

F--Debris Removal from FlL Bay and Ever
Results
Everglades, FL

Last Updated 10/25/2021 03:38 PM
Project Title

Rebuild UPH STA Ponce de Leon Inlet, New Smyrna Beach, FL

Physical Address View project details and contacts
City, State (County) New Smyrna Beach, FL 32168   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $6,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION. The U.S. Coast Guard Shore Infrastructure Logistics Center (SILC), Facilities Design and Construction Center (FDCC) intends to award a Firm-Fixed-Price (FFP) contract for Design and build new and modify the existing infrastructure required for the rebuild project at CG Station Ponce de Leon Inlet in New Smyrna Beach, Florida. The project has two (2) Base Items and six (6) option items. Base Item 0001: The scope includes the demolition of existing UPH and associated structures. Design and construct a new UPH structure and new site work. Site work includes new sidewalk, dumpster enclosure, paving and utility services. Utility services shall require new, provisional, and modifications to existing electrical, telecommunications, water, storm and sanitary sewer lines. Option Item 0001: The demolition of the existing ANT Boat Shed. Design and construct of a new ANT Boat Shed with necessary site work in the approximate location as the existing boat shed. Option Item 0002: Repave asphalt parking lot. Base Item 0002: The scope includes new waterfront infrastructure, site work, and demolition. Work include new floating dock, ANT storage area bulkhead protection, repair to boat ramp, relocating storage shed, demolition, utility services, site work, new fuel dispensers (with new fuel lines). Site work includes new sidewalk, paving and etc. Utility services shall require new, provisional, and modifications to existing electrical, telecommunications, water, and fuel lines. Option Item 0003: Repair existing groin. Option Item 0004: Repair existing bulkhead. Option Item 0005: Provide new covered mooring for the two (2) - 45 foot RBM boats at the floating docks. Option Item 0006: Design-Build Price - New Marine Fueling System Provide all labor, material, demolition, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for site development and construction related to providing a new marine fueling system.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Hydraulic Fabrications, Hydraulic Bulkheads, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents