Similar Projects
Flowers Chapel Road Widening Phase II - City of Dothan
Infrastructure
Conception
$5,100,000 CJ est. value
Dothan, AL 36305

Flowers Chapel Road Widening Phase II - City of Dothan
Infrastructure
Conception
$5,100,000 CJ est. value
Dothan, AL 36305

Fire Station #3 - Renovate Building - City of Dothan
Renovation, Infrastructure
Design
$550,000 CJ est. value
Dothan, AL 36303

Fire Station #10 Construction - City of Dothan
New Construction, Infrastructure
Design
$5,500,000 CJ est. value
Dothan, AL 36301

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

WWTP Force Main Project
Infrastructure
Bidding
$300,000 CJ est. value
Taylor, AL 36301

Honeysuckle Place Apartments
New Construction, Infrastructure
Sub-Bidding
$21,000,000 CJ est. value
Dothan, AL 36305

Constructing the Resurfacing on Hodgesville Road From the Junction of East Saunders Road
Post-Bid
$513,012 to $627,244 est. value
AL

Bituminous Surface Treatments
Infrastructure
Post-Bid
Dothan, AL

Constructing the Resurfacing on CR-41 (Walden Drive) from the Junction of Kinsey Road to the Junction of Broad Street in Kinsey (Site 1)
Infrastructure
Results
Dothan, AL 36303

Constructing the Left Turn Lane Addition and Intersection Modifications
Infrastructure
Results
$286,415 to $350,062 est. value
Dothan, AL

Dothan Landfill Expansion - City of Dothan
Infrastructure
Pending Verification
$6,200,000 CJ est. value
Dothan, AL 36303

Dothan Solar Project
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Dothan, AL 36301

Plaza Drive to Tacoma St. Drainage Improvements Bid
Infrastructure
Post-Bid
$300,000 CJ est. value
Dothan, AL 36301

Constructing the Safety Improvements (Intersection Improvements, Access Management, Turn Lane Improvements, Acceleration Lane Addition, and Median Crossover Protection)
Infrastructure
Results
$1,408,409 to $1,721,389 est. value
Dothan, AL 36301

Last Updated 12/05/2022 07:16 AM
Project Title

Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-53

Physical Address View project details and contacts
City, State (County) Dothan, AL 36303   (Houston County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $5,963,720 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Houston Constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-53 from the Florida State Line to the intersection of SR-210 (Ross Circle) in Dothan. Length 18.607 mi. The Bracket Estimate on this project is from $4,786,515 to $5,850,185 . Contract Time: 120 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 055 - Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-53 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents