Similar Projects
Last Updated | 12/02/2020 09:27 AM |
Project Title | Cooling Tower Replacement at Valley Horizon Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Yuma, AZ 85364 (Yuma County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For Cooling Tower Replacement at Valley Horizon Elementary School. The mechanical scope of work for this project includes removal and replacement of two (2) existing cooling towers and associated piping and components. DDC controls work includes re-installation of existing sensors on affected equipment and re-commissioning effort by controls contractor to verify existing sequences are operating per sequence and correcting as necessary, and adjusting any setpoints needed based on new cooling towers efficiency and operation. The structural scope of work for this project includes removal and replacement of existing steel supports, and anchoring of new supports and new cooling towers. The electrical scope of work for this project includes removal and replacement of existing disconnects, and modification of existing circuits and conduit to serve the new cooling tower fans. The existing fan VFD’s shall remain. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |