Similar Projects
Hand-In-Hand Early Learning Center
New Construction
Conception
$63,800,000 est. value
Oak Harbor, WA 98277

Mercer Block Office Towers and Mixed Use Development
New Construction - 890,000 SF
Design
$10,000,000 CJ est. value
Seattle, WA 98109

North Lot Phase 1
New Construction
Design
Seattle, WA 98144

HVAC Job Order Contracts Citywide
Alteration
Bidding
Renton, WA 98059

Replace HVAC at Bow Hill Weigh Station
Alteration
Bidding
$344,000 to $380,000 est. value
Bow, WA 98232

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Clallam County Courthouse VAV Replacement Project
Alteration
Results
$330,000 est. value
Port Angeles, WA 98362

PPWWTF Solids Drying Heat Exchanger Repairs
Alteration
Results
$200,000 to $250,000 est. value
Edmonds, WA 98020

Affordable Housing and Childcare Development
New Construction - 5,000 SF
Design
$13,000,000 est. value
Bellingham, WA 98225

District Wide Kitchen Hood Annual Inspections
Alteration
Bidding
Tacoma, WA

Kinder care Education
Renovation - 14,085 SF
Post-Bid
Shoreline, WA 98155

Headquarters Diesel Exhaust Removal System
Alteration
Results
$92,500 est. value
Belfair, WA 98528

Heritage University Early Learning Center
New Construction - 7,452 SF
Design
$3,200,000 est. value
Toppenish, WA 98948

VA American Lake Replace HVAC Building 19
Alteration
Bidding
$300,000 est. value
Lakewood, WA

Last Updated 05/24/2022 12:42 PM
Project Title

HVAC and Air Filtration Systems

Physical Address View project details and contacts
City, State (County) Sunnyside, WA   (Yakima County)
Category(s) Education, Single Trades
Sub-Category(s) HVAC, Pre-School/Daycare
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work – HVAC Replacements 1. Replace fifteen (15) HVAC Units as provided on HVAC Listing with equal new units. If recommending a different solution, please provide as a separate option for Inspire to consider. 2. Provide and install fifteen (15) Air Filtration System, preferred unit is Reme Halo, equal alternative units will be considered. 3. Quote will need to include replacement fencing around unit IF NEEDED, and replacement of pad for outdoor unit placement. 4. Removal and disposal of old unit. 5. Include all electrical hookups. 6. Startup of system and Training of Center Staff on filter changes, Air Filtration System maintenance, Thermostat settings, etc.

Details

Pre-School/Daycare, 1 Story Above Grade, Renovation, 1.18 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents