Last Updated 01/18/2021 08:02 AM
Project Title

Wakeforest Elevated Storage Tank Riser Pipe Replacement

Physical Address View project details and contacts
City, State (County) Houston, West University Place, TX 77005   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $130,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City wishes to replace approximately 100’of 12” flange to flange, concrete lined ductile iron riser pipe with bolts, gaskets and all hardware components. Furnish, remove and replace two (2) existing 12” valves. All materials, labor and installation costs to be included. Major components of this riser pipe replacement include but are not limited to: 1. Furnish approximately 100’of 12” flange to flange, concrete lined ductile iron pipe with bolts and gaskets. 2. Furnish new expansion joint with bolts and gaskets. 3. Furnish new galvanized support U Bolts. 4. Furnish new angle support brackets. 5. Replace schedule 80 steel stub that penetrates the bowl. 6. Demolish and dispose of the old pipe and components. 7. Installation of new pipe and components. 8. Furnish and install new saddle connection with 1” port, complete with brass fitting with a sample port, gauge and a place for the existing transducer. 9. Install pipe in zinc or epoxy prime coat and coat burns and hardware after completion. 10. Perform disinfection and hydrostatic test and return the tank leak free. Owner will perform the Bac-T sampling. 11. Remove two (2) 12” valves. ? Furnish and install two new (2) 12” valves.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents