Similar Projects
North City Hillside Projects
New Construction - 1,700,000 SF
Conception
$400,000,000 est. value
San Marcos, CA 92069

Kaweah Health Medical Center Tower
New Construction
Conception
$536,000,000 to $674,000,000 est. value
Visalia, CA 93291

UCSF Helen Diller Medical Center at Parnassus Heights
New Construction - 955,000 SF
Design
$10,000,000 CJ est. value
San Francisco, CA 94143

Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Renovation, Repair, and New Construction, of Medical Facility Construction at Various Government Installations
New Construction, Renovation
Design
$15,000,000 to $1,000,000,000 est. value

ZSFG Building 5 Seismic Upgrade and Renovation CM/GC Contract
Renovation
Bidding
San Francisco, CA 94103

Fort Yuma Health Center General Updates
Renovation - 76,295 SF
Bidding
$250,000 CJ est. value
Winterhaven, CA 92283

RFP D/B - Moffitt / Long Hospital Neuro Hybrid OR - Bid Package No. 5 Drywall
Renovation
Sub-Bidding
$350,000 CJ est. value
San Francisco, CA 94143

Bid Package #10 SCVMC Old Main Hospital Building Demolition and Rebuild - Phase 1, 2, 3 (partial), 4 (partial), 5, Utilities, Sitework
Demolition, New Construction, Infrastructure - 182,430 SF
Sub-Bidding
$49,000,000 CJ est. value
San Jose, CA 95128

VA Martinez Parking Structure
New Construction, Demolition - 128,000 SF
Post-Bid
$10,000,000 to $15,000,000 est. value
Martinez, CA 94553

Z2da--Remodel Emergency Department for Observation Beds - 570-17-210
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Fresno, CA 93703

Interventional Imaging Surgical Suite - Design-Build
Renovation
Results
$2,000,000 to $5,000,000 est. value
Fresno, CA 93703

VA San Diego Renovate Existing Emergency Department Phase 2
Renovation - 2,340 SF
Results
$2,000,000 to $5,000,000 est. value
San Diego, CA 92161

Ohana Adolescent Behavioral Health Center
New Construction - 55,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Monterey, CA 93940

El Camino Health
Renovation
Construction
$149,000,000 est. value
Mountain View, CA 94040

Cedars-Sinai Expansion
Addition - 405,000 SF
Pending Verification
Montebello, CA 90640

Last Updated 09/07/2022 11:04 AM
Project Title

Moffitt / Long Hospital 1st Floor Emergency Department (ED) CT Scan Replacement

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94143   (San Francisco County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This renovation project is located in the first floor Emergency Department of Moffitt-Long Hospital. The project area is approximately 1,300 square feet and consists of converting existing staff support spaces--staff work areas, offices, conference room, staff lounge, and staff locker area--into a new CT scan room, CT control room, CT equipment room, and (2) emergency department exam rooms. The project also includes the installation of a new outdoor cooling unit on the first-floor roof (level 2) directly above the new CT suite to support the new scanner and associated equipment. Design and Preconstruction services will include, at a minimum, design assist/design build, estimating, scheduling, constructability review, and bidding subcontractor design assist and construction bid packages. The project is to be constructed in accordance with the current California Building Code (CBC) and all other applicable codes, laws, and regulations including Title 22, Title 24, the NFPA Life Safety Code and the California Health and Safety Code. The project is subject to a review and approval by the Department of Health Care Access and Information (HCAI). Prior to the Bid Deadline and after bid opening, the University may establish a new Bid Deadline no earlier than 24 hours from the prior Bid Deadline, if no material changes are made to the bidding documents, and no earlier than 72 hours if material changes are made. In such event the University will, at a minimum, notify all persons or entities known by the University to have received a complete set of Bidding Documents and who has provided a street address and/or facsimile number for receipt of any written pre-bid communications. Bid Security in the amount of 10% of the Anticipated Contract Amount shall accompany each Bid. The surety issuing the Bid Bond shall be, on the Bid Deadline, an admitted surety insurer (as defined in California Code of Civil Procedure Section 995.120). The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage rates at the location of the work. The work described in the contract is a public work subject to sections 1771 of the California Labor Code. The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: License Classification: GENERAL BUILDING CONTRACTOR License Code: B Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The work described in the contract is a public work subject to section 1771 of the California Labor Code. No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code sections 1725.5 and 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour) and shall comply with all applicable federal, state and local working condition requirements. Employees Permitted Access to Work at UCSF: As of January 31, 2022, to the extent permitted by law, UCSF requires that only those employees of your company who are fully vaccinated for COVID, including all eligible booster vaccinations, will be permitted to work on a UCSF Site to perform work under your contract with UCSF. Compliance Reporting: UCSF reserves the right to request vaccine compliance reports that shall include the following regarding your employees: Number of fully vaccinated employees on UCSF Site Reporting Non-Compliance: If your company discovers that your employee is not in compliance with federal, state, and local public health orders, as well as UCSF's policies, your company shall remove the employee from the UCSF Site immediately and disallow your employee from working at UCSF until the individual is able to successfully comply with applicable public health orders and UCSF policy requirements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents