Similar Projects
The Settlement
New Construction
Conception
Simpsonville, SC

Southern Commons - Master Plan
New Construction
Conception
Cayce, SC 29172

Long Savannah - Master Plan
New Construction
Design
Charleston, SC

Woods Crossing
New Construction - 8,400 SF
Design
$8,000,000 est. value
Greenville, SC

Huntington Beach State Park Water Control Structure Repair
New Construction, Infrastructure
Bidding
$40,000 to $55,000 est. value
Murrells Inlet, SC 29576

St. George Town Park
New Construction
Bidding
Saint George, SC 29477

Resurfacing Tennis Courts at Daniel and Liberty High Schools
Post-Bid
Central, SC 29630

Phase I Environmental Assessment
Post-Bid
North Myrtle Beach, SC 29597

Newberry High School Track and Field
Results
Newberry, SC 29108

Resurfacing the Outdoor Running Track at Landrum High School (Remove Existing Surface)
Results
Less than $135,000 est. value
Campobello, SC 29322

St. Andrew By-The-Sea United Methodist Church Campus
New Construction
Construction
$755,000 est. value
Bluffton, SC 29910

The Waterfront
New Construction
Construction
Daniel Island, SC

Cornerstone
New Construction
Conception
Anderson, SC 29625

The Exchange at Old Town Depot
New Construction - 45,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Rock Hill, SC

St. George Town Park
New Construction
Bidding
Saint George, SC 29477

Last Updated 07/09/2021 01:49 AM
Project Title

BMX Supercross and Pump Track Renovations

Physical Address View project details and contacts
City, State (County) Rock Hill, SC   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide the City with a redesign, repair, and modifications to the existing BMX Supercross and Pump Tracks. The selected contractor will repair and resurface all 4 asphalt turns to the ridge of the first obstacle, all adjoined asphalt, and asphalt at the bottoms of the start hills with sealant. The fourth turn (T4) needs to have the asphalt removed and the turn rebuilt as needed to achieve proper compaction to address settling problems and meet the UCI request to improve the riders’ line coming out of turn 4 (T4).

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents