Project Title | RFQ Engineering - Rehabilitation: Pavement Replacement |
Physical Address | View project details and contacts |
City, State (County) | Cuba City, WI 53807 (Grant County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Request for Qualifications, Construction start expected August 2024 |
Bids Due | View project details and contacts |
Estimated Value | $15,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 11, 2020, this project is in the design phase. An engineer has been selected for the project. Information regarding contract selection has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2024. Highway - STH 80 Project Limits - N Limit Cuba City to Bus 151 County - Grant Anticipated Construction Cost $14,000,000-$14,999,999 This Project will rehabilitate; resurface and replace pavement on approximately 15.5 miles of STH 11 and STH 80 near Hazel Green and Platteville in Grant County. The proposed design will rehabilitate the aged, cracked and deteriorating pavement. Treatment is needed to extend the pavement service life. Pavement replacement via mill & overlay, spot curb & gutter repair, update curb ramps to ADA requirements, replace guard rail end terminals as needed, & intersection improvements at STH 11/80 & STH 80/81, Concrete surface repair & other minor repairs to B-22-07. Limits: WI-IL border, 1250' west of Oak St, Hazel Green, & BUS 151. Located in V & T of Hazel Green, C & T of Platteville, T of Smelser, Grant Cty. Gaps at northern intersection of STH 11/80, V of Cuba City, & STH 80/USH 151 interchange The contract price will be based on the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). ; Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. The fixed fee for this contract will apply an indirect cost factor of 150% to the consultants estimated direct labor, regardless of the consultants actual indirect rate. Do not include any information that meets the definition of "trade secret" as that term is defined in s. 134.90(1)(c), Wis. Stats. Rehabilitate and treat pavement with a mill and overlay. Replace guard rail end terminals as needed. Place a concrete deck overlay on B-22-0007. The project has 8.73 centerline miles; North Limit Cuba City to Business 151; City of Platteville, Town of Platteville, Town of Smelser, Grant County. Southwest Region Highway: STH 080 The method of contractor selection has not been determined at this time. WisDOT - SW-02 - RFQ Engineering - Rehabilitation: Pavement Replacement |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |