Similar Projects
Last Updated | 06/04/2021 10:31 AM |
Project Title | Caln Elementary School & East Fallowfield Elementary School Accessibility & Toilet Room Renovations |
Physical Address | View project details and contacts |
City, State (County) | Coatesville, Thorndale, PA 19372 (Chester County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | General Construction Contract: General Construction consisting of but not limited to the following: removal, replacement, and new work addressing all conditions required to complete the work of this contract as indicated on Architectural Drawings and Project Manual (specifications all divisions as applicable); Construction fencing at construction staging area; temporary facilities and services; selective demolition; cementitious underlayment; cold formed metal framing; carpentry; sealants; doors and frames; storefronts; glazing; hardware; exterior and interior finishes; accessories; specialties; inclined wheelchair lift. Mechanical Construction Contract: Mechanical Construction consisting of but not limited to the following: Unless noted otherwise on the drawings, demolition of existing mechanical systems within the toilet room work areas and related areas, removal, replacement and new work addressing all conditions required to complete the work of this contract as indicated on the drawings MP-100 and MP-101, and Project Manual (Division 22 and 23 and the applicable portions of the other divisions). Provide new air devices, exhaust fans, balancing dampers and ductwork with connections to the existing as indicated on the drawings; provide air balancing and report of new air devices connected to the and existing system, adjustment of systems; and all equipment indicated and specified. Provide new sanitary piping with connections to the existing as indicated on the drawings; new domestic hot and cold water distribution systems including insulation connecting to the existing piping as indicated on the plumbing drawings; new plumbing fixtures including all accessories; insulation, piping, vents; new water piping, balancing of water system, adjustment of systems; and all equipment indicated and specified. Contractor shall coordinate his work with the other prime contractors, making all necessary temporary connections to maintain water and waste flow outside of the work areas, acknowledging that temporary connections may need to be made outside of regular work hours. Contractor shall coordinate his work with the other prime contractors, making all necessary temporary connections. Electrical Construction Contract: New Electrical systems where noted consisting of but not limited to the following: Unless noted otherwise on the drawings, demolition of noted existing electrical systems, removal, replacement and new work addressing all conditions required to complete the work of this contract as indicated on the Electrical Drawings and Project Manual. Contractor shall coordinate his work with the other contractors, making all necessary temporary connections to maintain power to and in the building, acknowledging that temporary connections may need to be made outside of regular work hours. |
||||||||||||||||||||||||||||||||
Details | Misc. Buildings, Renovation.
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |