Similar Projects
Yazoo River Basin, Rocky Bayou, Yazoo Backwater Project, PL 116-20, Rocky Bayou Bank Stabilization
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Yazoo City, MS 39194

EWP Streambank Stabilization - 5 Sites - City of Hattiesburg, Forrest County, MS
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Hattiesburg, MS

South Industrial Park Access Road
Infrastructure
Bidding
Fulton, MS

Pavilion Vaught-Hemingway Stadium Drainage Corrections
Infrastructure
Bidding
Oxford, MS 38655

Erosion Repairs at CR 8541
Post-Bid
MS 38829

Drainage Improvements at Tennis Courts/Aquatic Center
Post-Bid
Booneville, MS 38829

Slide Repair
Results
MS

Bank Stabilization on US 84 at the Fair River (Bridge Nos. 74.9A and 74.9B)
Results
MS

2020 Winterville Mounds - Mound A Stabilization
Infrastructure
Bidding
Jackson, MS

Loyd Star Attendance Center Drainage and Grading Improvements
Post-Bid
Wesson, MS 39191

East Pinebrook Drive Drainage Improvement
Results
Brandon, MS

County Road 136 Slide Repair
Infrastructure
Bidding
Pittsboro, MS

Emergency Watershed Protection
Post-Bid
MS

Lanier High School Parking Improvements and JROTC Drainage Repair
Results
Jackson, MS 39203

Flood Damage Repairs FEMA
Infrastructure
Bidding
Hermanville, Pattison, Port Gibson, MS 39150

Last Updated 07/19/2021 11:20 AM
Project Title

Rail and Drainage Improvements Project

Physical Address View project details and contacts
City, State (County) Vicksburg, MS   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $281,034
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work is generally described as follows: Installation of precast concrete grade panels, reinforced concrete aprons, harness system, grading, erosion control mat, and related appurtenances.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents