Similar Projects
Repair RCBC Outlet with Riprap
Infrastructure
Conception
$271,000 CJ est. value
Kennebec, SD 57544

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$2,724,000 CJ est. value
Reliance, SD 57569

2022 Improvement Project, Schedule 2: Storage
Infrastructure
Bidding
$1,600,000 CJ est. value
Vivian, SD 57576

2022 Improvement Project, Schedule 2: Storage
Infrastructure
Bidding
$1,600,000 CJ est. value
Vivian, SD 57576

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Located and Mark SDDOT Owned Utilities in the Rapid City Region
Infrastructure
Results
$80,000 est. value
Kennebec, SD

Intake Improvements Lower Brule Rural Water System
Renovation, Infrastructure
Results
$746,241 CJ est. value
Lower Brule, SD 57548

Access Area Improvements, Fate Dam Lake Access Area
Infrastructure
Construction
$227,774 CJ est. value
Kennebec, SD 57544

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$5,923,000 CJ est. value
Reliance, SD 57569

Wastewater Outfall and Willow Street Improvements
Infrastructure
Post-Bid
$500,000 CJ est. value
Presho, SD 57568

SD 63 - Blotter Surfacing - South Dakota Department of Transportation
Infrastructure
Results
$2,913,163 CJ est. value
Vivian, SD 57576

Main Street Reconstruction
Infrastructure
Post-Bid
$400,000 est. value
Kennebec, SD

Last Updated 02/06/2023 03:12 AM
Project Title

Pipe Work, Erosion Repair

Physical Address View project details and contacts
City, State (County) Kennebec, SD 57544   (Lyman County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $734,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

I90 EBL & WBL - W of Exit 248 E to the Missouri River Bridge Length 14.3 As of February 06, 2023, the project is in Conceptual status. Anticipated Construction year is 2026. SDDOT - Pipe Work, Erosion Repair *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents