Similar Projects
Groff Park CPA - Town of Amherst
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Amherst, MA 01002

Mill River Playground - Town of Amherst
Infrastructure
Conception
$400,000 CJ est. value
Amherst, MA 01002

New Elementary School - Amherst Regional Public Schools
Demolition, New Construction, Infrastructure
Design
$98,000,000 CJ est. value
Amherst, MA 01002

Volvo Auto Sales Development / Northampton
Renovation, Infrastructure
Design
$500,000 CJ est. value
Northampton, MA 01060

Retaining Wall Replacement - Route 9
Infrastructure
Bidding
$4,230,000 CJ est. value
Cummington, MA 01026

PTVA Bus Stop Replacement
Infrastructure
Bidding
$60,000 CJ est. value
Amherst, MA 01002

Parking Lot 65 Holdsworth
Infrastructure
Post-Bid
$277,000 est. value
Amherst, MA

Parking Lot 28 Improvements
Infrastructure
Post-Bid
$4,300,000 est. value
Amherst, MA 01002

Smith Academy Park Improvements Phase II Pavilion Project Re-Bid
Infrastructure
Results
$356,750 CJ est. value
Hatfield, MA 01038

Mill Lane Multi-Use Path and Kellogg Avenue Sidewalk Reconstruction
Infrastructure
Results
Amherst, MA 01002

Hockanum Fence Replacement
Infrastructure
Construction
$87,500 CJ est. value
Hadley, MA 01035

Removal of Oil Tank at Amherst Regional Middle School
Infrastructure
Construction
$70,975 CJ est. value
Amherst, MA 01002

East Pleasant Mixed-Use Development
New Construction, Infrastructure - 1,300 SF
Pending Verification
$1,500,000 CJ est. value
Amherst, MA 01002

Maple Avenue Apartments
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Northampton, MA 01060

War Memorial Playground - Town of Amherst
Infrastructure
Conception
$350,000 CJ est. value
Amherst, MA 01002

Last Updated 08/23/2023 07:24 PM
Project Title

Town Hall Ramp Improvement Project

Physical Address View project details and contacts
City, State (County) Huntington, MA 01050   (Hampshire County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status All Submissions Received, Results Expected, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $274,797 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 29, 2022 no award was made for this project. This project is going to be re-bid at a later date.** The proposed project will remove the town's existing entrance ramp and construct new fully ADA compliant ramp. Additional site work related to the construction of the ramp will include excavation, earthwork, filling and grading. The Town of Huntington invites sealed Bids for the Town Hall Ramp Improvement Project. The proposed project will remove the town's existing entrance ramp and construct new fully ADA compliant ramp. Additional site work related to the construction of the ramp will include excavation, earthwork, filling and grading. This project is being administered by the Pioneer Valley Planning Commission (PVPC) and funded by the Massachusetts Department of Housing and Community Development, FY2020 Huntington Community Development Block Grant Program. The project's estimated construction cost is $138,000. Project: The project involves the removal of an existing approximately 45-foot concrete ramp and the construction of new fully ADA complaint ramp located between Town Hall and Stanton Hall buildings. Additional site work related to the construction of the ramp will include excavation, earthwork, filling and grading. Sub Bid Divisions: GC

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents