Similar Projects
Doors Security Corrections
Design
$2,000,000 to $5,000,000 est. value
Chicago, IL 60612

SCADA System Upgrade
Bidding
Evanston, IL

Barrington Road Pedestrian Bridge Access Control System
Bidding
Arlington Heights, IL

Wide Area Network
Post-Bid
Washington, DC

Video Event GPS Recorders
Post-Bid
Schaumburg, IL 60193

Building Automation System (BAS) Installation & Maintenance Enterprise-wide Services
Results

J063-- Upgrade Alarms/Intrusion Detection System
Results
IL 60141

2020 VDI Server Replacement
Post-Bid
Niles, IL 60714

Model Field Office Fiber Installation
Results
Chicago, IL 60661

RFI - Home Intrusion Detection Systems (CONUS/OCONUS)
Post-Bid

Main Street Triangle Parking Structure - Automatic Parking Access Control System
Results
Orland Park, IL 60462

SCADA Integration Services
Term Contract
Post-Bid
Chicago, IL

Provide, Install, and Maintain a Start a New 1Gb Circuit.
Results
Chicago, IL - Marinette, WI 54143

JPMC OP Audio Visual Equipment
Post-Bid
Chicago, IL

Cisco System Network Equipment and Support
Results
Des Plaines, IL 60016

Reported 03/30/2021 12:00 AM
Project Title

Integrated Control and Monitor System (ICMS) for the inclusion of extended Runway 9R-27L NAVAIDS

Physical Address View project details and contacts
City, State (County) Chicago, IL 60666   (Cook County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This is a sources sought/market survey seeking potential companies that can provide engineering, hardware, software and on-site installation required for the modification of the Integrated Control and Monitoring System (ICMS) for the inclusion of the Navigational and Visual Aids (NAVAIDS) for Runway 9R-27L and the Precision Approach Path Indicator (PAPI) Systems for Runways 9L-27R and 10R-28L at O'Hare International Airport, Chicago, Illinois. The scope of work shall include, but is not limited to the following: Expansion of the ICMS at C90 TRACON to include two new Thales Mark-20 Instrument Landing Systems (ILS) monitor/control interfaces with interlock capability for the north side of the airport. Removal of all legacy Mark-1F ILS monitor/control interfaces from the ICMS at C90 TRACON. Expansion of the ICMS at O'Hare International Airport ATCT to include PAPI monitor/control interfaces for Runways 9L-27R and 10R-28L. The ICMS is a monitor and control system that automates the interface to navigation and lighting aids equipment in an airport facility. The ICMS shall accomplish this automation in a No-Single-Point-of-Failure architecture. Any component of the ICMS can fail and the ICMS shall report the loss of that component and continue to function. The interface to the remote equipment shall be accomplished with redundant industrial grade computers called Concentrators. These Concentrators shall be linked to numerous ICMS workstations over dual redundanct local area networks (LANs). They shall collect status data from the Concentrators and present it to the user in a Graphical User Interface (GUI). The ICMS shall also provides automated category management for each runway based on the status of all relevant NAVAIDS equipment. All commands sent to the remote equipment and status changes received from the remote equipment are to be time and date stamped and logged into an archive file to achieve a "Black Box" on ground feature. The installation and use of ICMS will require no modification to the remote equipment. The ICMS should have the ability to be easily modified to support other existing and future ILS equipment. This system shall be designed to enhance safety, reliability and operational effectiveness of the entire air traffice control system at the airport.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents