Similar Projects
Fairview Road - Los Viboras Road to Aquistapace Road - San Benito County
Alteration
Conception
$363,950 est. value
Hollister, CA 95023

Wright Road - Buena Vista Road To 1 Mile East - Pwb2102 - San Benito County
Alteration
Conception
$2,650,000 est. value
Hollister, CA 95023

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Construct a New Interchange at Castroville Boulevard and Highway 156
Alteration
Design
$25,000,000 est. value
San Juan Bautista, CA 95045

Install Park Entrance Sign and Pullout
Infrastructure
Bidding
$250,000 CJ est. value
Pinnacles, CA 95043

Remove & Replace Septage Tank for Eastside Campground
Infrastructure
Bidding
$500,000 CJ est. value
Paicines, CA 95043

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

SB1 Road Maintenance Projects at Various Locations, FY 2020-2021
Infrastructure
Results
Hollister, CA

Construct roundabout
Infrastructure
Results
$9,000,000 est. value
CA

New Idria Road Crossing - San Benito County
Infrastructure
Conception
$470,000 est. value
Idria, CA

Rocks Road Bridge Replacement Over Tres Pinos Creek - RF 33-705 - San Benito County
New Construction, Demolition, Infrastructure
Design
$3,104,000 est. value
San Juan Bautista, CA 95045

Hollister Air Attack Base - Temporary Barracks Utility Installation
Alteration
Post-Bid
$2,000,000 est. value
Hollister, CA 95023

Widening Highway From 2-Lane to 4-Lane Controlled Access Highway
Infrastructure
Results
$55,000,000 est. value
CA

Cole Road to South Ricardo to North Ricardo to Anzar Road - PWB-2105 - San Benito County
Infrastructure
Conception
$674,844 est. value
Aromas, CA

Last Updated 08/03/2022 01:04 PM
Project Title

Felipe Nine

Physical Address View project details and contacts
City, State (County) Hollister, CA 95023   (San Benito County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $118,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a cannabis cultivation greenhouse building. As of August 3, 2022, the project is in design. The site plan is under review by the City of Hollister Planning Commission. No building permits have been submitted. An architect has been selected; however, information regarding the general contractor ahs not been provided A firm timeline has not been established, however; vertical construction is not expected to begin prior to fourth quarter 2022 .* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

337,710 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents