Similar Projects
Fault (H-1979-S10) and Brown (H-1497-S) Well Improvements
Bidding
Ruidoso, NM

Roosevelt County Fairgrounds Storm Drainage Improvement Project
Bidding
Portales, NM

Roadway Construction and Storm Drainage
Post-Bid
Bernalillo, NM 87004

Fairgrounds Drainage and ADA Compliance Plan
Post-Bid
Portales, NM

SWNARRC - Demo and Construct Pond Kettles
Demolition
Results
$1,000,000 to $250,000 est. value
Dexter, NM 88230

Z--Installation of Continuous Channel Drain for Water
Results
$25,000 to $100,000 est. value
Kirtland, NM

Roadway, Flood Control, and Facilities Construction Price Agreement
Term Contract
Bidding
Las Cruces, NM

Copper King Trail Improvements
Post-Bid
Red River, NM 87558

Calle Baack Roadway and Drainage Improvements
Results
Bernalillo, NM 87004

Design and Construct a Polishing Pond
Bidding
Loving, NM

Altura Avenue Phase III Infrastructure Improvements Project
Post-Bid
Columbus, NM 88029

City Wide Pond Maintenance
Results
Albuquerque, NM

Upper Gila Diversion Project
Bidding
Silver City, NM

Restore Some Retention Dams and Erosion Control Structures
Post-Bid
Cuba, NM 87013

Arroyo Flood Control Authority (Sscafca) Lisbon Channel Improvements Project
Results
Less than $400,242 est. value
Rio Rancho, NM 87124

Last Updated 05/05/2021 05:46 AM
Project Title

Northern Boulevard Expansion Phase II

Physical Address View project details and contacts
City, State (County) Rio Rancho, NM   (Sandoval County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is a reconstruction of Northern Boulevard from Acorn Loop to Broadmoor Boulevard, including the reconstruction of the Unser Boulevard and Northern Boulevard intersection. The Consultant shall be responsible for all studies, surveys, analyses, coordination, engineering, and all other necessary documents to complete the final design, final right-of-way mapping (including summary platting at the completion of right-of-way acquisition), traffic control, final environmental documentation (including any requirements from State Historical Preservation Office - SHPO), final drainage report and storm drain design including improvements to the adjacent Los Montoyas Arroyo drainage tributaries, construction bid package, and all the necessary certifications and specifications. The Consultant shall designate a project manager to be the sole point of contact to the City’s project manager. The Consultant project manager shall have experience managing similar size and scope of projects. Change in Consultant’s project manager during the project will require written approval by the City’s project manager before the proposed change is made. The consultant shall demonstrate a proven QC process for plan development.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents