Similar Projects
Douglas Avenue Improvements - City of Roseburg
Infrastructure
Conception
$700,000 CJ est. value
Roseburg, OR 97470

Taxiway A Extension - City of Roseburg
Infrastructure
Conception
$1,400,000 CJ est. value
Roseburg, OR 97470

I-5: Exit 125 Northbound at Garden Valley Blvd
Infrastructure
Design
$2,200,000 CJ est. value
Roseburg, OR 97470

OR 38: Hinsdale Slough Culvert
Infrastructure
Design
$1,431,000 CJ est. value
Elkton, OR 97436

RFP - Leachate Pre-Treatment Plant Operations And Maintenance
Infrastructure
Bidding
$230,000 CJ est. value
Roseburg, OR 97470

Parking and Site Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Sutherlin, OR 97479

Douglas High School Culinary Classroom
New Construction, Infrastructure - 970 SF
Post-Bid
$908,000 CJ est. value
Winston, OR 97496

Douglas High School Culinary Classroom
New Construction, Infrastructure - 970 SF
Post-Bid
$908,000 CJ est. value
Winston, OR 97496

Coffenberry Middle School Cafeteria Building
New Construction - 7,850 SF
Results
$1,000,000 to $5,000,000 CJ est. value
Myrtle Creek, OR 97457

OR138E Glide Restriping and RRFB Project
Infrastructure
Results
$338,833 CJ est. value
Roseburg, OR 97470

MOD Pizza
Renovation, Alteration - 2,800 SF
Construction
$225,000 est. value
Roseburg, OR 97471

City of Myrtle Creek - Riverside Pump Station
Demolition, New Construction, Infrastructure
Construction
$1,494,900 CJ est. value
Myrtle Creek, OR 97457

Douglas Avenue Water Main Replacement - City of Roseburg
Infrastructure
Conception
$900,000 CJ est. value
Roseburg, OR 97470

RFP D/B - Glide Schools Design-Build Playground Cover
Infrastructure
Design
$325,000 CJ est. value
Glide, OR 97443

Riddle Rural Fire Station Seismic Retrofit
Infrastructure
Bidding
$300,000 CJ est. value
Riddle, OR 97469

Last Updated 06/02/2023 09:10 AM
Project Title

Pegasus Equestrian-Centered Resort

Physical Address View project details and contacts
City, State (County) Oakland, OR 97462   (Douglas County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Convention/Exhibit Center, Food/Beverage Service, Hotel/Motel, Site Development, Stadium
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $90,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 2, 2023, this project is in planning. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been set; however, construction is not expected to begin prior to 2024.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting, Special Coatings.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment, Pedestrian Control Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Hospitality Furniture, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Facility Lightning Protection, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents